Idle Logout In:
20
:
00
 
 
RIDOT Project Management Portal  
 
Standard Item Listwill be available. View Details here.
Contact PMP Technical Support Contact PMP Support  
 
Account Login

Email:
Password:
Remember my email.
Reset Password

BID MANAGEMENT REPORTS

Quarterly Breakdown
Bid Tabs
RIDOT Quarterly Report


WAUP (Quest Based Bids) (2002 – 2022)
WAUP (OSP Based Bids (2023 – Present)


DOCUMENTS

All Documents
 
Construction Procedu...
Construction Project...
Construction Project...
Contractor Invoicing...
Contractor Reference...
Design File Cabinet
DPMs
Manual - Bridge (LRF...
Manual - CAD Standar...
Manual - Highway Des...
Manual - Traffic Des...
Newsletters
Price Adjustments
RE Ref. Memo
TAC
User Manuals
Utility Information
WBS
Filter
User Manual

ATTENTION

**************************************

The CMS portion of PMP will be unavailable starting at 4:00pm on Monday, June 23rd, 2025 until 1:00pm Tuesday July 1st 2025, due to Fiscal Year End Reporting. Please plan your work accordingly. Thank You.

**************************************

Support:
Please direct any general assistance requests for help with PMP to: dot.pmptechnical@dot.ri.gov or use the Contact PMP Support link to get specific help with a particular area of PMP, such as Quest or CMS. All functional areas/groups within PMP are listed in the document in that link.

PMP Access Permissions:
Requests for new access to any module of PMP, such as Design, Quest or CMS, or changes to existing permissions, as well as reinstatement of a Disabled Account, must be done by completing a PMP User Request/Change Form: PMP User Request Change Form. Complete the form, sign and date it, then email it to dot.PMPUserRequest@dot.ri.gov.
Once you have been granted access, you will receive an email with Login instructions.


Password Resets:
If you have exceeded the number of login attempts allowed by the system and your account has been locked, or if you have forgotten your password, please email dot.pmptechnical@dot.ri.gov and they will assist you.

Project Team Member Access:
In order to access any project within PMP, a user must be assigned as a Team Member for that project and also have access to that module of PMP.
Requests to be added as a Design Team Member should be directed to the RIDOT Project Manager associated with that project, while requests to be added as a Construction Team Member should be directed to its Resident Engineer.



DEFINE DOCUMENT FILTER
 Category Name
  DPMs
  WBS
  TAC
  Newsletters
  TAPE
  User Manuals
  Manual - CAD Standards
  Manual - Highway Design
  Manual - Traffic Design
  Manual - Bridge (LRFD) Design
  Design File Cabinet
  Utility Information
  Contractor Reference Memo
  RE Ref. Memo
  Construction Project Docs
  Construction Project Closeout
  Price Adjustments
  Contractor Invoicing Documents
  Construction Procedures and Flow Charts
 Keyword
  Design Sectins
  Design Sections
  Document Type
  DPM Section
 
Select Keyword Value

 
Current Categories Current Keywords
No Categories have been selected.
No Keywords have been selected.
   

 
 
 
The Project Management Portal does not currently support being open simultaneously in multiple browser tabs/windows.

Please close all tabs/windows except one, and click the refresh button.

We apologize for any inconvenience.