Download
|
|
0 File Cabinet Job Specific Index 2009-10-01.pdf
| 10/01/2009 |
Download
|
|
001 Title VI Environmental Justice Documentation Requirement w Atch 12-01-2015.pdf
| 12/01/2015 |
Download
|
|
002 Title VI Environmental Justice Documentation Requirement Revised 12-08-2015.pdf
| 12/08/2015 |
Download
|
|
105.14 Opening Sections of Project To Traffic 09-29-2009.pdf
| 09/29/2009 |
Download
|
|
2008 RIDOT Highway Design Manual Rev 09-27-2013.pdf
| 09/27/2013 |
Download
|
|
2010-CT-041 - Add. 2 - High Hazard Intersections (New
| |
Download
|
|
2011-CB-066 - Add. 0 - Emergency Repairs to Louisquis
| |
Download
|
|
2011-CH-043 - Add. 1 - Waterfront Drive - Warren Aven
| |
Download
|
|
2013-CI-001 - Add. 0 - Safe Routes to School - Infras
| |
Download
|
|
2014-CH-039 - Add. 1 - 1R Improvements to Mineral Spr
| |
Download
|
|
2014-CH-069 - Add. 1 - ADA Rehabilitation of Park and
| |
Download
|
|
2014-CT-013 - Add. 3 - Highway Safety Improvement Pro
| |
Download
|
|
2014-CT-044 - Add. 3 - 2014 HSIP Near-Term Improvemen
| |
Download
|
|
2015 Liquid Asphalt Diesel fuel Prices.doc
| 12/31/2015 |
Download
|
|
2016 Liquid Asphalt Diesel fuel Prices.doc
| 12/31/2016 |
Download
|
|
2016-CB-040 - Add. 2 - Statewide Bridge Repairs Contr
| |
Download
|
|
2017 Liquid Asphalt Diesel fuel Prices.doc
| 12/31/2017 |
Download
|
|
2017-CR-065 - Add. 0 - 2018 Crack Sealing Limited Acc
| |
Download
|
|
2017-CT-044 - Add. 0 - Mileage Based Exit Renumbering
| |
Download
|
|
2017-CT-074 - Add. 1 - State Traffic Commission (STC)
| |
Download
|
|
2018 Liquid Asphalt Diesel Fuel Prices.doc
| 01/07/2019 |
Download
|
|
2018 Structural Steel Prices.pdf
| 02/25/2019 |
Download
|
|
2018-CB-084 - Add. 3 - Bridge Group 05 - EGR, EXE, WA
| |
Download
|
|
2018-CH-043 - Add. 0 - Roger Williams Park/ Route 10
| |
Download
|
|
2018-CT-076 - Add. 1 - Metacom Avenue - HSIP
| |
Download
|
|
2019 Liquid AsphaltDiesel Fuel Prices.pdf
| 01/16/2020 |
Download
|
|
2019 Steel Base Prices.pdf
| 09/05/2020 |
Download
|
|
2019-CB-068 - Add. 3 - Bridge Group 16B - FOS, JOH, P
| |
Download
|
|
2020 Liquid AsphaltDiesel Fuel Prices.pdf
| 02/04/2021 |
Download
|
|
2020 Steel Base Prices.pdf
| 12/31/2020 |
Download
|
|
2020-7-1 Subcontractor Progress Payment Verification Form.pdf
| 07/29/2020 |
Download
|
|
2020-7-30 Signed Amended Policy for Subcontractor Prompt Payment.pdf
| 07/29/2020 |
Download
|
|
2020-7-31 Amended Prompt Payment Policy Notice.pdf
| 07/29/2020 |
Download
|
|
2020-CB-014 - Add. 0 - Emergency Repairs to Pleasant
| |
Download
|
|
2020-CB-040 - Add. 1 - Bridge Group 57J - Browning Mi
| |
Download
|
|
2021 Liquid AsphaltDiesel Fuel Prices.pdf
| 01/18/2022 |
Download
|
|
2021 Steel Base Prices RIDOT.pdf
| 08/15/2022 |
Download
|
|
2021-DB-020 - Add. 0 - Bridge Group 57T-10 – I-195 Wa
| |
Download
|
|
2022 Liquid AsphaltDiesel Fuel Prices.pdf
| 01/04/2023 |
Download
|
|
2022 Steel Base Prices.pdf
| |
Download
|
|
2023 Liquid AsphaltDiesel Fuel Prices.pdf
| 01/11/2024 |
Download
|
|
2023 Steel Base Prices.pdf
| |
Download
|
|
2024 Liquid Asphalt Diesel Fuel Prices.pdf
| 11/15/2024 |
Download
|
|
2024 Liquid AsphaltDiesel Fuel Prices.pdf
| 10/09/2024 |
Download
|
|
206.99XX - Inlet Sediment Control Device 08-24-2015.pdf
| 08/24/2015 |
Download
|
|
803.99XX Remove and Dispose Existing Abutments.pdf
| 05/28/2015 |
Download
|
|
803.99XX Remove and Dispose Existing Pier.pdf
| 05/28/2015 |
Download
|
|
803.99XX Remove and Dispose Existing Superstructure.pdf
| 05/28/2015 |
Download
|
|
804.99XX Instrumentation and Monitoring.pdf
| 05/28/2015 |
Download
|
|
805.99XX Temporary Earth Retaining Systems.pdf
| 05/28/2015 |
Download
|
|
809 Precast_Prestressed Structure Concrete Masonry.pdf
| 05/28/2015 |
Download
|
|
809.99XX Prestressed Concrete Next Beam Type 24F-Furnish, Fabricate & Erect Class HP 8,500 PSI.pdf
| 05/28/2015 |
Download
|
|
BABA Certification Form - RIDOT - Per Item.docx
| |
Download
|
|
C&M Bridge Agreement Template Rev November 5 2013.doc
| 11/05/2013 |
Download
|
|
C&M Bridge Special Bridge Closing Agreement Template November 5 2013.doc
| 11/05/2013 |
Download
|
|
C&M Highway 1R Type Projects Agreement Template Rev November 5 2013.doc
| 11/05/2013 |
Download
|
|
C&M Highway Agreement Template Rev November 5 2013.doc
| 11/05/2013 |
Download
|
|
C&M Municipality and State to Fund and Maintain Agreement Template Rev November 5 2013.doc
| 11/05/2013 |
Download
|
|
C&M Traffic HRRRSIP Agreement Template Rev November 5 2013.doc
| 11/05/2013 |
Download
|
|
C&M Traffic STC SIGNAL Agreement Template Rev November 5 2013.doc
| 11/05/2013 |
Download
|
|
CAD Standards Manual (2007)
| 10/31/2007 |
Download
|
|
CAD Support Drawing <> FORMAT SHEET
| 10/31/2007 |
Download
|
|
CAD Support Drawing <> PLAT COVER
| 10/31/2007 |
Download
|
|
CAD Support Drawing <> XXXXX_V1_002_STDSYM
| 10/31/2007 |
Download
|
|
CAD Support Drawing <> XXXXX_V1_004_STDNOTES02 Rev3
| 03/10/2010 |
Download
|
|
CAD Support File <> .CTB (Plot Style Table)
| 10/31/2007 |
Download
|
|
CAD Support File <> .DWT (Dimension Template File)
| 10/31/2007 |
Download
|
|
CAD Support File <> .LIN (Line Type Library File)
| 10/31/2007 |
Download
|
|
CAD Support File <> .SHX (Shape File for Line Types)
| 10/31/2007 |
Download
|
|
Cash Flow Spreadsheet -- Draft.xlsx
| 07/15/2020 |
Download
|
|
Change Order Full Procedure 12 18 2023.docx
| 12/18/2023 |
Download
|
|
Change Order Item Review 11-18-22 Form 2.pdf
| 01/01/1900 |
Download
|
|
Change Order Procedure 03-31-2023.pdf
| 03/31/2023 |
Download
|
|
Change Order Request Template Rev. 10-2022.pdf
| 10/21/2022 |
Download
|
|
Compilation of Approved Specifications: Dec 2004
| 12/31/2004 |
Download
|
|
Compilation of Approved Specifications: Jan - Jul 2004
| 07/30/2004 |
Download
|
|
Conctractor Reference Memo 2011-01 Start of Construction Season Meeting.pdf
| 01/11/2011 |
Download
|
|
Construction ROC Check List Rev 10-30-23.docx
| 10/30/2023 |
Download
|
|
Contractor Invoicing Template Process- Contractor .pdf
| 09/01/2020 |
Download
|
|
Contractor Item quantity pay request backup template v3.pdf
| 04/03/2023 |
Download
|
|
Contractor Reference Memo 2011-06 Winter Shut Down.pdf
| 11/18/2011 |
Download
|
|
Contractor Reference Memo - 2013-01 Policy and Procedures for Change Orders.pdf
| 03/11/2013 |
Download
|
|
Contractor Reference Memo - 2013-02 Project Issues Log.pdf
| 04/26/2013 |
Download
|
|
Contractor Reference Memo 2010-01 Start of Construction Season.pdf
| 08/13/2010 |
Download
|
|
Contractor Reference Memo 2010-02 Change Order Back Up.pdf
| 08/14/2010 |
Download
|
|
Contractor Reference Memo 2010-03 Price Adjustment for Change Orders.pdf
| 08/21/2010 |
Download
|
|
Contractor Reference Memo 2010-04 Substantial Completion 101.71.pdf
| 09/07/2010 |
Download
|
|
Contractor Reference Memo 2010-05 Cold Weather Concrete and Concrete Curing.pdf
| 10/23/2010 |
Download
|
|
Contractor Reference Memo 2010-06 Storage of Equipment and Material.pdf
| 08/12/2010 |
Download
|
|
Contractor Reference Memo 2011-02 Sidewalk Construction.pdf
| 05/23/2011 |
Download
|
|
Contractor Reference Memo 2011-03 REVISED Contractor, Subcontractor, Resident Engineer, Inspector I
| 09/28/2011 |
Download
|
|
Contractor Reference Memo 2011-03 Contractor, Subcontractor, Resident Engineer, Inspecto Interaction
| 05/23/2011 |
Download
|
|
Contractor Reference Memo 2011-04 Remove and Dispose Contract Items.pdf
| 10/14/2011 |
Download
|
|
Contractor Reference Memo 2011-05 Change Order Payment Tolerence.pdf
| 11/17/2011 |
Download
|
|
Contractor Reference Memo 2012-01 New Chief Civil Engineers.pdf
| 02/13/2012 |
Download
|
|
Contractor Reference Memo 2012-02 Drop.Offs and Paving Operations.pdf
| 08/16/2012 |
Download
|
|
Contractor Reference Memo 2012-03 Field Offices.pdf
| 09/01/2012 |
Download
|
|
Contractor Reference Memo 2012-04 2012 Paving Operations.pdf
| 04/20/2012 |
Download
|
|
DPM 100.01 - DPM Administration
| 03/09/2005 |
Download
|
|
DPM 220.06 - Project Tracking System (PTS) Numbers
| 03/16/2015 |
Download
|
|
DPM 230.04 - Selection of Subconsultants and Design Related Service Providers
| 12/01/2006 |
Download
|
|
DPM 230.05 - Monthly Progress Reports for Consultant Contract Monitoring - REVISED
| 09/23/2005 |
Download
|
|
DPM 230.05 <> Monthly Progress Report (MPR) Form (REVISED)
| 09/23/2005 |
Download
|
|
DPM 230.18 <> Survey Form (Aerial) SUA012000
| 01/01/2000 |
Download
|
|
DPM 230.18 <> Survey Form SU012000
| 01/01/2000 |
Download
|
|
DPM 320.11 - Access to Private Property
| 12/01/2006 |
Download
|
|
DPM 320.11 <> Sample Letter 1 - Undisturbed Access (Attachment)
| 12/01/2006 |
Download
|
|
DPM 320.11 <> Sample Letter 2 - Disturbed Access (Attachment)
| 12/01/2006 |
Download
|
|
DPM 330.13 - Preparation of a Freshwater Wetland Permit Application
| 08/10/2005 |
Download
|
|
DPM 410.04 - Context Sensitive Solutions
| 08/10/2004 |
Download
|
|
DPM 420.01 - Survey Field Books Material Specification and Format - REVISED
| 08/24/2007 |
Download
|
|
DPM 450.01 - Project Submission Identification - REVISED
| 12/04/2006 |
Download
|
|
DPM 450.01A - Submission Matrix 09-07-22.pdf
| 09/07/2022 |
Download
|
|
DPM 450.02 - Plans Content Requirements
| 04/21/2005 |
Download
|
|
DPM 450.02 <> Amended Plat Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
DPM 450.02 <> Condemnation Plat Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
DPM 450.02 <> Conveyance Plat Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
DPM 450.02 <> Right of Way Plan Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
DPM 450.03 - Design Backup Finalization Submission - REVISED
| 05/04/2007 |
Download
|
|
DPM 450.05 - Work Zone Safety and Mobility 12-23-2008.pdf
| 12/23/2008 |
Download
|
|
DPM 450.05 <> RIDOT (SAMPLE) Level 1 TMP Rev 11-06-09.pdf
| 11/06/2009 |
Download
|
|
DPM 450.05 <> RIDOT (SAMPLE) Level 3 TMP Rev 11-06-09.pdf
| 11/06/2009 |
Download
|
|
DPM 450.05 <> RIDOT (SAMPLE) Level 4 TMP Rev 11-06-09.pdf
| 11/06/2009 |
Download
|
|
DPM 450.05 <> RIDOT Level 1 TMP Template Rev. 11-06-09.xls
| 11/16/2009 |
Download
|
|
DPM 450.05 <> RIDOT Level 2 TMP Template Rev. 11-06-09.xls
| 11/06/2009 |
Download
|
|
DPM 450.05 <> RIDOT Level 3 TMP Template Rev. 11-06-09.xls
| 11/06/2009 |
Download
|
|
DPM 450.05 <> RIDOT Level 4 TMP Template Rev. 11-06-09.xls
| 11/06/2009 |
Download
|
|
DPM 450.05 <> TTC Plan - Typical Lane Closure Limited Access.pdf
| 12/23/2008 |
Download
|
|
DPM 450.05 <> TTC Plan - Typical Lane Closure Two-Lane Road.pdf
| 12/23/2008 |
Download
|
|
DPM 450.05 <> TTC Plan - Typical Lane Shift Two-Lane Road.pdf
| 12/23/2008 |
Download
|
|
DPM 450.05 <> TTC Plan - Typical Shoulder Closure Limited Access.pdf
| 12/23/2008 |
Download
|
|
DPM 450.05 <> TTC Plan - Typical Shoulder Closure Two-Lane Road.pdf
| 12/23/2008 |
Download
|
|
DPM 450.06 - Plan Sheet File Name
| 04/15/2005 |
Download
|
|
DPM 450.10 - Right-of-Way Submissions - REVISED
| 01/31/2005 |
Download
|
|
DPM 450.10 <> Sample 01 Temporary Use Agreement
| 03/09/2010 |
Download
|
|
DPM 450.10 <> Sample 01 Temporary Use Agreement
| 03/09/2010 |
Download
|
|
DPM 450.10 <> Sample 02 Temporary Easement Agreement
| 03/09/2010 |
Download
|
|
DPM 450.10 <> Sample 02 Temporary Easement Agreement
| 03/29/2004 |
Download
|
|
DPM 450.10 <> Sample 02 Temporary Easement Agreement-ExhibitA.pdf
| 03/09/2010 |
Download
|
|
DPM 450.10 <> Sample 03 Permanent Loop Detector Easement.doc
| 03/09/2010 |
Download
|
|
DPM 450.10 <> Sample 03a Permanent Loop Detector Easement & Exhibits A, A1 & B.pdf
| 03/09/2010 |
Download
|
|
DPM 450.10 <> Sample 04 Highway Condemnation Plat
| 03/29/2004 |
Download
|
|
DPM 450.10 <> Sample 05 Deed or Highway Plan
| 01/29/2004 |
Download
|
|
DPM 450.10 <> Sample 12 Permanent Utility Easement May 2015.doc
| 05/01/2015 |
Download
|
|
DPM 450.10 <> Sample 13 Permanent Underground Utility Easement May 2015.doc
| 05/01/2015 |
Download
|
|
DPM 450.10 <> Sample 14 Permanent Bikeway Easement May 2015.docx
| 05/01/2015 |
Download
|
|
DPM 450.10 <> Sample 14 Permanent Traffic Signal Control Easement May 2015.doc
| 05/01/2015 |
Download
|
|
DPM 450.10 <> Sample 15 Permanent Easement - Pedestrian Sidewalk May 2015.doc
| 05/01/2015 |
Download
|
|
DPM 450.10 <> Sample 16 Permanent Easement - Bikeway May 2015.docx
| 05/01/2015 |
Download
|
|
DPM 450.10 <> Sample 17 Deed of Permanent Easement
| 03/29/2004 |
Download
|
|
DPM 450.10 <> Sample 18 Exhibit A for Deed Transfer
| 03/29/2004 |
Download
|
|
DPM 450.10 <> Sample 19 Certificate of State Agency Land Transfer
| 07/26/2004 |
Download
|
|
DPM 450.13 - Utilities Submissions and Coordination
| 12/08/2005 |
Download
|
|
DPM 450.13 <> Utility Submissions (Sample Letters 1 and 2)
| 12/08/2005 |
Download
|
|
DPM 450.14 - Advance Utility Work - REVISED
| 06/30/2006 |
Download
|
|
DPM 450.14 <> Advance Utility Work "Force Account" Sample Letter
| 06/30/2006 |
Download
|
|
DPM 450.14 <> Sample Letter (Attachment)
| 06/30/2006 |
Download
|
|
DPM 450.23 - Environmental Site Assessment Investigation and Hazardous Material Waste Detection and
| 05/01/2006 |
Download
|
|
DPM 460.01 - Preparation of Contract Specific Documents - REVISED
| 11/08/2005 |
Download
|
|
DPM 460.01 <> Contract Specific Documents "Bookmark" Attachment - REVISED
| 11/08/2005 |
Download
|
|
DPM 460.08 - Funding Authorization Request - REVISED
| 03/31/2006 |
Download
|
|
DPM 460.08 <> Project Inventory Sheet (Sample)
| 03/31/2006 |
Download
|
|
DPM 460.08 <> Project Inventory Sheet (Word)
| 03/31/2006 |
Download
|
|
DPM 460.08 <> PS&E Checklist (Sample)
| 02/04/2005 |
Download
|
|
DPM 460.08 <> PS&E Checklist Blank (Sample)
| 02/02/2005 |
Download
|
|
DPM 460.08 <> Sample - Advertise Letter
| 04/24/2009 |
Download
|
|
DPM 460.08 <> Sample - Advertise Letter Rev 04-24-2009.doc
| 04/24/2009 |
Download
|
|
DPM 460.08 <> Sample - PSE Authorization Letter to Chief Engineer Rev 12-21-2012.doc
| 12/21/2012 |
Download
|
|
DPM 460.08 <> Sample - PSE Authorization Letter to Chief Engineer Rev 12-21-2012.pdf
| 12/21/2012 |
Download
|
|
DPM 460.09 - Advertising Process
| 02/02/2005 |
Download
|
|
DPM 460.11 - Disk Preparation for Advertising and Contract Award - REVISED
| 01/31/2005 |
Download
|
|
DPM 460.XX <> Funding & Advertising Process Checklist
| 02/02/2005 |
Download
|
|
DPM 480.01 <> User Manual for RIDOT gINT database
| 10/31/2007 |
Download
|
|
DPM 480.01 Geotechnical Environmental Boring Logs and GeoInfo Database .pdf
| 10/31/2007 |
Download
|
|
DPM 710.01 - Landscape Architectural Policy
| 05/04/2007 |
Download
|
|
DPM 920.06 - Bicycle Routes & Share the Road Signs - REVISED
| 07/26/2006 |
Download
|
|
DPM 920.06 - Bicycle Routes & Share the Road Signs - REVISED
| 07/26/2006 |
Download
|
|
DPM 920.06 <> Bicycle Route Suitability Report Rev 07-26-2006.pdf
| 07/26/2006 |
Download
|
|
DPM 920.06 <> RIDOT Bicycle Route Suitability Report Rev 07-26-2006.doc
| 07/26/2006 |
Download
|
|
Guidelines for Load and Resistance Factor Rating of Highway Bridges Rev1 January 2011
| 01/07/2011 |
Download
|
|
July 2019 Steel Base Prices.pdf
| 10/24/2019 |
Download
|
|
materials test book lump sum breakdown required information.docx
| 09/18/2023 |
Download
|
|
Materials Test Book LumpSum Item Template.xlsx
| 04/03/2023 |
Download
|
|
Pedestrian Timing Calculation Sheet EXAMPLE.pdf
| 03/09/2018 |
Download
|
|
PMM Project Management Background
| 07/26/2004 |
Download
|
|
PMM Purpose
| 07/26/2004 |
Download
|
|
PMM Table of Contents
| 07/26/2004 |
Download
|
|
PMP Newsletter Vol. 1 Issue 1
| 10/28/2004 |
Download
|
|
PMP Newsletter Vol. 1 Issue 2
| 03/16/2005 |
Download
|
|
PMP Newsletter Vol. 1 Issue 3
| 09/01/2005 |
Download
|
|
PMP Support Structure
| 11/24/2008 |
Download
|
|
PMP-0001 Newsletter
| 10/28/2004 |
Download
|
|
PMP-0002 Newsletter
| 03/16/2005 |
Download
|
|
Project Status Meeting - Template 2021.xlsx
| 04/14/2021 |
Download
|
|
Project Status Meeting Minutes Template 9-10-2024.xlsx
| 09/11/2024 |
Download
|
|
QuestWeb Cheat Sheet (Revised)
| 10/22/2007 |
Download
|
|
RIDOT Bridge Design Standard Details Rev July 2015.pdf
| 07/22/2015 |
Download
|
|
RIDOT Bridge Inspection Manual October 2013.pdf
| 10/16/2013 |
Download
|
|
RIDOT HAulhub Required Fields.pdf
| 06/12/2024 |
Download
|
|
RIDOT HAulhub Required Fields.xlsx
| 06/12/2024 |
Download
|
|
RIDOT LRFD Bridge Design Manual
| 01/31/2007 |
Download
|
|
RIDOT Memo re Change Order Request Procedure.pdf
| 04/14/2023 |
Download
|
|
RIDOT Shop Drawing Instructions.pdf
| 08/29/2019 |
Download
|
|
RIDOT Traffic Design Manual
| 10/01/2004 |
Download
|
|
RIDOTBuy-America-Waiver-Request.docx
| |
Download
|
|
SUPERSEDED 2008 RIDOT Highway Design Manual September 2008.pdf
| 09/30/2008 |
Download
|
|
Superseded CAD Support Drawing <> XXXXX_V1_001_COVER
| 10/31/2007 |
Download
|
|
Superseded CAD Support Drawing <> XXXXX_V1_003_STDNOTES01 Rev2
| 03/10/2010 |
Download
|
|
SUPERSEDED List Only Correspondence to Utility Companies for RIDOT Projects 03-14-2013.pdf
| 03/14/2013 |
Download
|
|
SUPERSEDED RIDOT Highway Design Manual September 2009 Rev 2-10-2009.pdf
| 02/10/2009 |
Download
|
|
SUPERSEDED TAC 0406 Bridge Minimum Vertical Clearance Guidelines 11-17-22.pdf
| 11/17/2022 |
Download
|
|
TAC 0001 - Bicycle Routes and Share the Road Signs (DPM 920.06) - SUPERSEDED BY 0008
| 05/26/2004 |
Download
|
|
TAC 0002 - Instruction for the Prep of the Contract Specific Docs (DPM 460.01) - SUPERSEDED BY 0053
| 05/26/2004 |
Download
|
|
TAC 0003 - Project Submission Identification (DPM 450.01) - SUPERSEDED BY 0009
| 06/28/2004 |
Download
|
|
TAC 0005 - Back-up Finalization (DPM 450.03) - SUPERSEDED BY 0089
| 08/10/2004 |
Download
|
|
TAC 0006 - Context Sensitive Solutions (DPM 410.04)
| 08/10/2004 |
Download
|
|
TAC 0007 - Right of Way Submissions (DPM 450.10) - SUPERSEDED BY 0027
| 08/10/2004 |
Download
|
|
TAC 0008 - Bicycle Routes Share the Road Signs (DPM 920.06) - SUPERSEDED BY 0026
| 08/10/2004 |
Download
|
|
TAC 0009 - Project Submission Identification (450.01) - SUPERSEDED BY 0055
| 08/10/2004 |
Download
|
|
TAC 0010 - Item Code 934 Field Control and Construction Layout
| 08/16/2004 |
Download
|
|
TAC 0011 Traffic Signal Wire Conduit.pdf
| 09/03/2004 |
Download
|
|
TAC 0012 - General Notes Regarding Temporary Construction Conditions - SUPERSEDED BY 0031
| 10/01/2004 |
Download
|
|
TAC 0013 - Temporary Traffic Control Plans for Short Term Bridge Work
| 11/03/2004 |
Download
|
|
TAC 0014 - Placement of Epoxy Resin Pavement Markings
| 11/08/2004 |
Download
|
|
TAC 0015 - Walkability Concepts Workshop - OBSOLETE
| 11/23/2004 |
Download
|
|
TAC 0016 - Object Markers and No Turn Signs
| 12/02/2004 |
Download
|
|
TAC 0017 - Security and Access of Two Capitol Hill
| 12/03/2004 |
Download
|
|
TAC 0018 - RIDOT Traffic Design Manual
| 12/03/2004 |
Download
|
|
TAC 0019 - Designer's Responsibility regarding Survey Field Control
| 12/07/2004 |
Download
|
|
TAC 0020 - Miscellaneous Expenses - Mileage Reimbursement Increase - SUPERSEDED BY 0050
| 12/29/2004 |
Download
|
|
TAC 0021 - Pavement Structure and Mixes for RIDOT Projects
| 12/29/2004 |
Download
|
|
TAC 0022 - RI Standard Specs for Road and Bridge - 2004 Ed. Compilations
| 01/05/2005 |
Download
|
|
TAC 0023 - Guidelines For the Use of Shoulder Rumble Strips
| 01/12/2005 |
Download
|
|
TAC 0024 - Project Tracking System (PTS) Numbers (DPM 220.06)
| 01/12/2005 |
Download
|
|
TAC 0025 - Tracking Consultant Requests for Contract Change
| 01/12/2005 |
Download
|
|
TAC 0026 - Bicycle Routes Share the Road Signs (DPM 920.06) - SUPERSEDED BY 0039
| 01/18/2005 |
Download
|
|
TAC 0027 - Right of Way Submissions (DPM 450.10) - REVISED
| 01/31/2005 |
Download
|
|
TAC 0028 - Disk Preparation for Advertising and Contract Award (DPM 460.11)
| 01/31/2005 |
Download
|
|
TAC 0029 - Funding Authorization Request (DPM 460.08) - SUPERSEDED BY 0062
| 02/02/2005 |
Download
|
|
TAC 0030 - Advertising Process (DPM 460.09)
| 02/02/2005 |
Download
|
|
TAC 0031 - General Notes Regarding Temporary Construction Conditions
| 03/09/2005 |
Download
|
|
TAC 0032 - DPM Administration (DPM 100.01)
| 03/09/2005 |
Download
|
|
TAC 0033 - 90% Review Meeting Checklist - SUPERSEDED BY 0086
| 03/16/2005 |
Download
|
|
TAC 0034 - Bridge Load Ratings
| 03/29/2005 |
Download
|
|
TAC 0035 - Consultant Retainage Factor
| 04/04/2005 |
Download
|
|
TAC 0036 - Plan Sheet File Name (DPM 450.06)
| 04/22/2005 |
Download
|
|
TAC 0037 - Plan Content Requirements (DPM 450.02)
| 04/22/2005 |
Download
|
|
TAC 0038 - Plans, Specifications and Estimates (PS&E) Submissions
| 05/12/2005 |
Download
|
|
TAC 0039 - Bicycle Routes Share the Road Signs (DPM 920.06) - SUPERSEDED BY 0054
| 05/25/2005 |
Download
|
|
TAC 0040 - Low Clearance Signs
| 06/22/2005 |
Download
|
|
TAC 0041 - Bicycle Safe Grates
| 07/19/2005 |
Download
|
|
TAC 0042 - Compilation of Approved Standards Aug 2005
| 08/05/2005 |
Download
|
|
TAC 0043 - Projects Requiring a Pre-bid Conference
| 08/09/2005 |
Download
|
|
TAC 0044 - Adjustment Prices for Diesel Fuel and Liquid Asphalt
| 08/09/2005 |
Download
|
|
TAC 0045 - Survey Field Books Material Specs and Format (DPM 420.04) - SUPERSEDED BY 0095
| 08/11/2005 |
Download
|
|
TAC 0046 - Preparation of a FWW Permit Application (DPM 330.13)
| 08/12/2005 |
Download
|
|
TAC 0047 - Monthly Progress Reports for Contract Monitoring (DPM 230.05) - SUPERSEDED BY 0051
| 08/26/2005 |
Download
|
|
TAC 0048 - Quest Professional Upgrade Version 4.4.6 - OBSOLETE
| 08/26/2005 |
Download
|
|
TAC 0049 - Overhead Utility Line Clearances SUPERSEDED BY TAC 0342
| 06/20/2005 |
Download
|
|
TAC 0050 - Miscellaneous Expenses - Mileage Reimbursement Increase - SUPERSEDED BY 0057
| 09/23/2005 |
Download
|
|
TAC 0051 - Monthly Progress Reports for Consultant Contract Monitoring (DPM 230.05) - REVISED
| 09/23/2005 |
Download
|
|
TAC 0052 - Correspondence to Narragansett Electric Company for RIDOT Projects
| 10/06/2005 |
Download
|
|
TAC 0053 - Preparation of the CSD (DPM 460.01) - REVISED
| 11/08/2005 |
Download
|
|
TAC 0054 - Bicycle Routes Share the Road Signs - SUPERSEDED BY 0070
| 11/08/2005 |
Download
|
|
TAC 0055 - Project Submission Identification (DPM 450.01) - SUPERSEDED BY 0080
| 12/07/2005 |
Download
|
|
TAC 0056 - Utilities Submissions and Coordination (DPM 450.13)
| 12/08/2005 |
Download
|
|
TAC 0057 - Decrease in Mileage Reimbursement Rate - SUPERSEDED BY 0081
| 01/20/2006 |
Download
|
|
TAC 0058 - 3" Minimum Conduit Under Pavement for Wiring
| 01/23/2006 |
Download
|
|
TAC 0059 - RI Standard Details 1998 Edition
| 01/27/2006 |
Download
|
|
TAC 0060 - RI Standard Specifications for Road and Bridge Construction 2004 Edition Compilation of A
| 01/27/2006 |
Download
|
|
TAC 0061 - Bridge Inspection and Evaluation
| 04/10/2006 |
Download
|
|
TAC 0062 - Funding Authorization Request (DPM 460.08) - REVISED
| 04/12/2006 |
Download
|
|
TAC 0063 - Original Signed Mylar Cover Sheets
| 04/24/2006 |
Download
|
|
TAC 0064 - Request for Original Contract Plans with Attachment
| 04/24/2006 |
Download
|
|
TAC 0065 - Environmental Site Assessment Investigation and Hazardous Material Waste Detection
| 05/01/2006 |
Download
|
|
TAC 0066 - Advance Utility Work (DPM 450.14) - SUPERSEDED BY 0068
| 05/01/2006 |
Download
|
|
TAC 0067 - Introduction of QuestWeb
| 06/12/2006 |
Download
|
|
TAC 0068 - Advance Utility Work (DPM 450.14) - REVISED
| 06/30/2006 |
Download
|
|
TAC 0069 - Flagpersons and Flagpersons - Overtime
| 06/29/2006 |
Download
|
|
TAC 0070 - Bicycle Routes & Share the Road Signs (DPM 920.06) - REVISED
| 07/26/2006 |
Download
|
|
TAC 0071 - PAPA Guidance - Public and Private Tie-Ins to the State's Drainage System
| 07/28/2006 |
Download
|
|
TAC 0072 - Traffic Person Sign in Sheet
| 09/20/2006 |
Download
|
|
TAC 0073 - Request for Information and Shop Drawing Reviews
| 11/06/2006 |
Download
|
|
TAC 0074 - CTD and PSMS
| 11/01/2006 |
Download
|
|
TAC 0075 - Revised Standard Details (Nov 06)
| 11/10/2006 |
Download
|
|
TAC 0076 - Compilation of Approved Specifications: Nov 2006
| 11/10/2006 |
Download
|
|
TAC 0077 - Hot Mix Recycling
| 11/23/2006 |
Download
|
|
TAC 0078 - Selection of Subconsultant and Design Related Service Providers (DPM 230.04)
| 12/04/2006 |
Download
|
|
TAC 0079 - Access to Private Property (DPM 320.11)
| 12/04/2006 |
Download
|
|
TAC 0080 - Project Submission Identification (DPM 450.01) - REVISED
| 01/04/2007 |
Download
|
|
TAC 0081 - Miscellaneous Expenses: Mileage Reimbursement Increase - SUPERSEEDED by 0105
| 01/18/2007 |
Download
|
|
TAC 0082 - Prime Consultant Sub-Consultant Release of Retainage
| 03/07/2007 |
Download
|
|
TAC 0083 - RIDOT Survey Relocated to Two Capitol Hill
| 03/23/2007 |
Download
|
|
TAC 0084 - LFRD Bridge Design Manual
| 04/02/2007 |
Download
|
|
TAC 0085 - Plan Contents Requirements - Std Notes 1 and 2 (DPM 450.02) - REVISED
| 04/16/2007 |
Download
|
|
TAC 0086 - 90% Review Meeting Checklist - REVISED
| 04/27/2007 |
Download
|
|
TAC 0086 <> 90% Review Meeting Checklist - REVISED
| 04/27/2007 |
Download
|
|
TAC 0087 Working Without Task Time or Insufficient Funds 02-14-2008.pdf
| 02/14/2008 |
Download
|
|
TAC 0088 - Hurricane Evacuation Route
| 05/18/2007 |
Download
|
|
TAC 0089 - Design Backup Finalization Submissions (DPM 450.03) - REVISED
| 05/18/2007 |
Download
|
|
TAC 0090 - Landscape Architectural Policy (DPM 710.01)
| 05/18/2007 |
Download
|
|
TAC 0091 - Geotechnical Environmental Boring Logs and GeoInfo Database Training
| 06/25/2007 |
Download
|
|
TAC 0092 - Pavement Structures for RIDOT Projects
| 07/27/2007 |
Download
|
|
TAC 0093 - RFI Protocol
| 09/06/2007 |
Download
|
|
TAC 0094 - Prohibition of Adhesive Anchors in Overhead Highway Applications
| 09/18/2007 |
Download
|
|
TAC 0095 - Survey Field Books Material Specs and Format (DPM 420.01)
| 08/24/2007 |
Download
|
|
TAC 0096 - Landscaped Island Soil Bed
| 09/05/2007 |
Download
|
|
TAC 0097 - Insurance Requirement for Work Within, Adjacent To or Over a Railroad ROW 12-20-2007
| 12/20/2007 |
Download
|
|
TAC 0098 - RIDOT CAD Standards Manual July 2007 10-31-2007 - SUPERSEDED BY 0334
| 10/31/2007 |
Download
|
|
TAC 0099 5-Day RIVIP Addenda Rule 01-07-2008.pdf
| 01/07/2008 |
Download
|
|
TAC 0100 - RI Standard Specifications for Road and Bridge Construction 2004 Edition - Compilation
| 11/07/2007 |
Download
|
|
TAC 0100 <> Compilation of Changes Nov 2007
| 11/07/2007 |
Download
|
|
TAC 0101 - Geotechnical Environmental Boring Logs and GeoInfo Database (DPM 480.01)
| 10/31/2007 |
Download
|
|
TAC 0102 - RI Standard Specs for Road and Bridge Construction 2004 Edition - Compilation of Changes
| 11/09/2007 |
Download
|
|
TAC 0102 <> Compilation of Approved Specifications - Nov 2007 (Corrected Table of Contents)
| 11/09/2007 |
Download
|
|
TAC 0103 - DPM 450.02 Plan Contents Requirements - Std Notes 2 (Rev 11-19-2007)
| 11/19/2007 |
Download
|
|
TAC 0104 Work Already Performed Without An Approved ROC and CA 02-15-2008.pdf
| 02/15/2008 |
Download
|
|
TAC 0105 Miscellaneous Expenses - Mileage Reimbursement Increase 3-19-2008 - SUPERSEDED BY 0124
| 03/19/2008 |
Download
|
|
TAC 0106 Acting Deputy Chief Enginee Acting Managing Engineer 5-1-2008.pdf
| 05/01/2008 |
Download
|
|
TAC 0107 Compilation of Approved Specifications May 2008.pdf SUPERSEDED BY 0108
| 05/06/2008 |
Download
|
|
TAC 0107 RI Standard Specifications for Road and Bridge Construction 2004 SUPERSEDED BY 0108
| 05/06/2008 |
Download
|
|
TAC 0108 Compilation of Approved Specifications May08 Rev1 5-07-2008.pdf
| 05/07/2008 |
Download
|
|
TAC 0108 RI Standard Specifications for Road and Bridge Construction 2004 Edition - Compilation of A
| 05/07/2008 |
Download
|
|
TAC 0109 Trim and Fine Grade of Sub Grade Below Loam and Seeded Areas 6-25-2008.pdf
| 06/25/2008 |
Download
|
|
TAC 0110 RI Standard Specifications for Road and Bridge Construction 2004 Edition - Compilation of A
| 08/12/2008 |
Download
|
|
TAC 0111 RI Standard Details Revised and New June 2008 8-12-2008.pdf
| 08/12/2008 |
Download
|
|
TAC 0112 Chief Engineer Appointment 9-8-2008.pdf
| 09/08/2008 |
Download
|
|
TAC 0113 Attachment Index Pages Supp No7.pdf
| 06/27/2008 |
Download
|
|
TAC 0113 Index Pages Supp No7.pdf
| 09/08/2008 |
Download
|
|
TAC 0114 Plantings in Areas Subject to Winter Salt Treatment and Salt Spray 9-11-2008.pdf
| 09/11/2008 |
Download
|
|
TAC 0115 Worker Visibility - Title 23 CFR Part 634 6-19-2008.pdf
| |
Download
|
|
TAC 0115 Worker Visibility - Title 23 CFR Part 634 9-19-2008.pdf
| 09/19/2008 |
Download
|
|
TAC 0116 Highway Design Manual 9-30-2008.pdf
| 09/30/2008 |
Download
|
|
TAC 0117 <> Compilation of Approved Specifications September 2008.pdf
| 10/01/2008 |
Download
|
|
TAC 0117 Compilation of Approved Specifications 10-01-2008.pdf
| 10/01/2008 |
Download
|
|
TAC 0118 Compilation of Approved Specifications CHAMPS Spec No 929.0300.pdf
| 10/14/2008 |
Download
|
|
TAC 0119 Haunch Impact on Concrete Deck Quantity 10-28-2008.pdf
| 10/28/2008 |
Download
|
|
TAC 0120 Quest Estimates 10-29-2008.pdf
| 10/29/2008 |
Download
|
|
TAC 0121 RIDOT Environmental Resources Section 11-24-2008.pdf
| 11/24/2008 |
Download
|
|
TAC 0122 DPM 450.05 Work Zone Safety and Mobility 12-23-2008.pdf
| 12/23/2008 |
Download
|
|
TAC 0122 DPM 450.05 Work Zone Safety and Mobility 12-23-2008 w atch.pdf
| 12/23/2008 |
Download
|
|
TAC 0122 RIDOT Work Zone Safety and Mobility Policy 12-23-2008.pdf
| 12/23/2008 |
Download
|
|
TAC 0123 Informational Meeting for DPM 450.05 Work Zone Safety and Mobility 12-23-2008.pdf
| 12/23/2008 |
Download
|
|
TAC 0124 - Miscellaneous Expenses - Mileage Reimbursement Increase 1-14-2009 - SUPERSEDED BY 0149
| 01/14/2009 |
Download
|
|
TAC 0125 - Miscellaneous Expenses - Mileage Reimbursement Increase 1-16-2009 - SUPEREDED BY 0149
| 01/16/2009 |
Download
|
|
TAC 0126 <> CS Pages Sequence of Construction Paragraph 01-30-2009.pdf
| 01/30/2009 |
Download
|
|
TAC 0126 <> CS Pages TMP Paragraph 01-30-2009.pdf
| 01/30/2009 |
Download
|
|
TAC 0126 <> JS Section 101 01-30-2009.pdf
| 01/30/2009 |
Download
|
|
TAC 0126 <> JS Section 103 01-30-2009.pdf
| 01/30/2009 |
Download
|
|
TAC 0126 <> JS Section 104 01-30-2009.pdf
| 01/30/2009 |
Download
|
|
TAC 0126 <> JS Section 105 01-30-2009.pdf
| 01/30/2009 |
Download
|
|
TAC 0126 New Contract Document Requirements for Work Zone Safety and Mobility 01-30-2009 w Atchs.pdf
| 01/30/2009 |
Download
|
|
TAC 0127 Transportation Management Plan Templates Rev 2-11-2009 - SUPERSEDED BY 0144
| 02/11/2009 |
Download
|
|
TAC 0128 Highway Design Manual Div 8 Rev 2-10-2009.pdf
| 02/10/2009 |
Download
|
|
TAC 0129 2009 Directory of City and Town Officials 3-13-2009.pdf
| 03/13/2009 |
Download
|
|
TAC 0130 Advertising and Award Template CDs 3-19-2009.pdf
| 03/19/2009 |
Download
|
|
TAC 0131 Prime Consultant Release of Retainage 4-3-2009.pdf
| 04/03/2009 |
Download
|
|
TAC 0132 Highway Design Manual Div 2 Rev 4-07-2009 4-07-2009.pdf
| 04/07/2009 |
Download
|
|
TAC 0133 American Recovery and Reinvestment Act (ARRA) Projects 5-1-2009.pdf
| 05/01/2009 |
Download
|
|
TAC 0133 ARRA Provision Attachment 5-1-2009.pdf
| 05/01/2009 |
Download
|
|
TAC 0134 Guidelines for Load and Resistance Factor Rating of Hwy Bridges April 2 SUPERSEDED BY 0172
| 05/22/2009 |
Download
|
|
TAC 0134 SUPERSEDED BY TAC 0172 LRFR Guidelines for Highway Bridges April 2009.pdf
| 05/22/2009 |
Download
|
|
TAC 0135 <> Index Pages Rev 05-26-2009.pdf
| 05/26/2009 |
Download
|
|
TAC 0135 <> Standard Details May 2009.pdf
| 05/01/2009 |
Download
|
|
TAC 0135 RI Standard Details Revised Index and New Standard Details 5-26-2009.pdf
| 05/26/2009 |
Download
|
|
TAC 0136 <> Compillation of Approved Specifications June 2009.pdf
| 06/01/2009 |
Download
|
|
TAC 0136 Compillation of Approved Specifications June 2009 06-01-2009.pdf
| 06/01/2009 |
Download
|
|
TAC 0137 Contract Completion Dates and Quest Submissions 6-23-2009.pdf
| 06/23/2009 |
Download
|
|
TAC 0138 Access to State Land 7-10-2009.pdf
| 07/10/2009 |
Download
|
|
TAC 0139 <> Index Pages 7-31-2009
| 07/31/2009 |
Download
|
|
TAC 0139 <> RI Std Det 40.2.1 Rev1 7-31-2009.pdf
| 07/31/2009 |
Download
|
|
TAC 0139 RI Standard Details Rev 7-31-2009.pdf
| 07/31/2009 |
Download
|
|
TAC 0140 Deck Finishing Machine Requirements 9-02-2009
| 09/02/2009 |
Download
|
|
TAC 0141 Allowable Time Between Asphalt Pavement Milling and Resurfacing 9-29-2009.pdf
| 09/29/2009 |
Download
|
|
TAC 0142 Guardrail End Treatments 10-06-2009.pdf
| 10/06/2009 |
Download
|
|
TAC 0143 Compillation of Approved Specifications October 2009 11-06-2009.pdf
| 11/06/2009 |
Download
|
|
TAC 0144 Transportation Management Plan Templates Revisions November 6 2009 11-09-2009.pdf
| 11/09/2009 |
Download
|
|
TAC 0145 <> 90% Review Meeting Checklist - Rev 11-24-2009 Editable
| 11/24/2009 |
Download
|
|
TAC 0145 SUPERSEDED BY TAC 0184 90% Review Meeting Checklist Rev 11-24-2009.pdf
| 11/24/2009 |
Download
|
|
TAC 0146 <> RIDOT Policy Guidelines for the Use of Trafficpersons and Flagpersons
| 12/18/2009 |
Download
|
|
TAC 0146 Guidelines for the Use of Trafficpersons and Flagpersons in Work Zones 12-23-2009
| 12/23/2009 |
Download
|
|
TAC 0147 2009 Edition MUTCD 01-05-2010.pdf
| 01/05/2010 |
Download
|
|
TAC 0148 5-Day RIVIP Addenda Rule 01-11-2010.pdf
| 01/11/2010 |
Download
|
|
TAC 0149 Miscellaneous Expenses - Mileage Reimbursement Increase 1-20-2010.pdf
| 01/20/2010 |
Download
|
|
TAC 0150 Editable Form Design Review Tracking Form 29 Dec 2009.doc
| 12/29/2009 |
Download
|
|
TAC 0150 Design Review Tracking Form 29 Dec 2009 2-18-2010.pdf
| 02/18/2010 |
Download
|
|
TAC 0151 RI Bridge Design Standard Details 2009 01-29-2010.pdf
| 01/29/2010 |
Download
|
|
TAC 0152 American Recovery and Reinvestment Act (ARRA) Projects 02-08-2010.pdf
| 02/08/2010 |
Download
|
|
TAC 0153 Guidance for Engineering Contract Modifications 02-22-2010.pdf
| 02/22/2010 |
Download
|
|
TAC 0154 BRASS Rating Software 02-15-2010.pdf
| 02/15/2010 |
Download
|
|
TAC 0155 DPM 450-10 Right-of-Way Submission - Sample Documents 03-10-2010.pdf
| 03/10/2010 |
Download
|
|
TAC 0156 Materials Application in Quest Module 06-22-2010.pdf
| 06/22/2010 |
Download
|
|
TAC 0156 DRAFT User Manual for Quest Users 11/18/2009.pdf
| 06/22/2010 |
Download
|
|
TAC 0157 Expired Preliminary Engineering Contracts 06-23-2010.pdf
| 06/23/2010 |
Download
|
|
TAC 0158 Mission Safety 2010 Conference 08-02-2010.pdf
| 08/02/2010 |
Download
|
|
TAC 0159 Reinforcement of Department Policy on Survey Deliverables 08-10-2010.pdf
| 08/02/2010 |
Download
|
|
TAC 0160 Epoxy Resin Pavement Markings 10-5-2010.pdf
| 10/05/2010 |
Download
|
|
TAC 0161 RI Std Detail 43.3.1 Wheelchair Ramp For Limited Right-Of-Way Areas 09-14-2010.pdf
| 09/14/2010 |
Download
|
|
TAC 0162 Detectable Warning System Width 09-14-2010.pdf
| 09/14/2010 |
Download
|
|
TAC 0163 Compillation of Approved Specifications September 2010 10-12-2010.pdf
| 10/12/2010 |
Download
|
|
TAC 0164 Revised Compillation of Approved Specifications September 2008 10-21-2010.pdf
| 10/21/2010 |
Download
|
|
TAC 0165 Standard Details Revised Index and Details New Detail June 1 2010 10-28-2010.pdf
| 10/28/2010 |
Download
|
|
TAC 0166 RI Bridge Standard Drawings Rev March 10 2010 10-28-2010.pdf
| 10/28/2010 |
Download
|
|
TAC 0167 DPM 450.02 Plans Content Requirements STANDARD NOTES-1 and STANDARD NOTES-2 Rev March 10 2010 10-28-2010
| 10/28/2010 |
Download
|
|
TAC 0168 Clarification for Epoxy Resin Pavement Markings 11-19-2010.pdf
| 11/19/2010 |
Download
|
|
TAC 0169 Job Specific Item Code Numbering for Remediation Work 12-10-2010.pdf
| 12/10/2010 |
Download
|
|
TAC 0170 Epoxy Resin Pavement Markings over Winter Season 12-17-10.pdf
| 12/17/2010 |
Download
|
|
TAC 0171 New Stormwater Design and Installation Manual Effective January 1 2011 12-31-2010.pdf
| 12/31/2010 |
Download
|
|
TAC 0172 <> RIDOT LRFR Guidelines January 2011 Rev1.pdf
| 01/07/2011 |
Download
|
|
TAC 0172 Revised Guidelines for Load and Resistance Factor Rating of Highway Bridges January 2011
| 01/07/2011 |
Download
|
|
TAC 0173 Requirements for Obtaining RIDOT Historical Plans and Plats in tif format 01-14-2011.pdf
| 01/14/2011 |
Download
|
|
TAC 0174 Miscellaneous Expenses - Mileage Reimbursement Increase 01-14-2011.pdf
| 01/14/2011 |
Download
|
|
TAC 0175 <> January 24 2011 Compilation of Approved Specifications (compilation only).pdf
| 01/24/2011 |
Download
|
|
TAC 0175 Compillation of Approved Specifications January 24 2011 01-25-2011.pdf
| 01/25/2011 |
Download
|
|
TAC 0176 Employment of Accelerated Construction Techniques (ACT) 02-03-2011.pdf
| 02/03/2011 |
Download
|
|
TAC 0177 Section I Part 100 and Reference to RIDOA Emergency Procurement Regulations Section 12 02-
| 02/14/2011 |
Download
|
|
TAC 0178 JS Pages to Complement RIDOA Emergency Procurement Regulations Section 12 02-17-2011 with
| 02/17/2011 |
Download
|
|
TAC 0179 Job Specific Code 938.1000 PRICE ADJUSTMENT 03-18-2011.pdf
| 03/18/2011 |
Download
|
|
TAC 0180 Flagperson Minimum Rates for Straignt Time and Overtime 4-28-2011.pdf
| 04/28/2011 |
Download
|
|
TAC 0181 Atch JS T20 99XX - Temporary Epoxy Resin Pavement Markings editable 04-15-11.doc
| 05/04/2011 |
Download
|
|
TAC 0181 Atch Sample JS T20 99XX - Temporary Epoxy Resin Pavement Markings 04-15-11.pdf
| 05/04/2011 |
Download
|
|
TAC 0181 Atch Temporary Epoxy Item Description-UOM.pdf
| 05/04/2011 |
Download
|
|
TAC 0181 Temporary Epoxy Resin Pavement Markings 05-04-2011.pdf
| 05/04/2011 |
Download
|
|
TAC 0182 Bid Submittal Requirment 05-11-2011.pdf
| 05/11/2011 |
Download
|
|
TAC 0183 Minimum Shoulder Sidewalk and Lane Widths on Bridges 05-11-2011.pdf
| 05/11/2011 |
Download
|
|
TAC 0184 SUPERSEDED BY TAC 0197 90% Review Meeting Checklist - Rev 05-18-2011 Editable.xls
| 05/18/2011 |
Download
|
|
TAC 0184 SUPERSEDED BY TAC 0197 90% Review Meeting Checklist 05-18-2011.pdf
| 05/18/2011 |
Download
|
|
TAC 0185 <> Compillation of Approved Specifications May 18, 2011 (compilation only).pdf
| 05/18/2011 |
Download
|
|
TAC 0185 Compillation of Approved Specifications May 18 2011 05-31-2011.pdf
| 05/18/2011 |
Download
|
|
TAC 0186 RI Standard Details Index and Revised Details 7-18-2011.pdf
| 07/18/2011 |
Download
|
|
TAC 0187 Consideration of Use of 9 Proven Crash Countermeasures 09-21-2011.pdf
| 09/21/2011 |
Download
|
|
TAC 0188 Per Diem Rates for Field Survey Crews and Hourly Office Rates 09-30-2011.pdf
| 09/30/2011 |
Download
|
|
TAC 0189 Potential Professional Services Solicitations 10-11-2011.pdf
| 10/11/2011 |
Download
|
|
TAC 0190 <> Compilation of Approved-Specifications, December 2011 (compilation only).pdf
| 12/30/2011 |
Download
|
|
TAC 0190 Compilation of Approved Specifications 12-30-2011.pdf
| 12/30/2011 |
Download
|
|
TAC 0191 Guidance on Patented and Proprietary Product Approval December 5 2011 01-03-2012.pdf
| 01/03/2012 |
Download
|
|
TAC 0192 Use of Automatic Trenching Machine on RIDOT Projects 02-03-2012.pdf
| 02/03/2012 |
Download
|
|
TAC 0193 Hot Mix Asphalt - New Mix Designation Matrix February 6 2012, 02-21-2012.pdf
| 02/06/2012 |
Download
|
|
TAC 0193 RIDOT HMA Matrix 02-06-2012.pdf
| 02/06/2012 |
Download
|
|
TAC 0194 <> Quest Item Code Deletions Dec 29 2011 attachment.pdf
| 12/29/2011 |
Download
|
|
TAC 0194 Quest Standard Item Code Revisions Dec 29 2011, 02-21-2012.pdf
| 12/29/2011 |
Download
|
|
TAC 0195 <> Supp No 17 Compilation of Approved Specifications April 17, 2012.pdf
| 04/17/2012 |
Download
|
|
TAC 0195 Compilation of Approved Specifications April 2012 04-17-2012.pdf
| 04/17/2012 |
Download
|
|
TAC 0196 New Stormwater Polution Prevention Plan (SWPPP) Templates 04-11-2012.pdf
| 04/11/2012 |
Download
|
|
TAC 0197 <> 90% Review Meeting Checklist - Rev 04-11-2012 Editable.xls
| 04/11/2012 |
Download
|
|
TAC 0197 90% Review Meeting Checklist Rev 04-11-2012.pdf
| 04/11/2012 |
Download
|
|
TAC 0198 Technical Infeasibility Determination Policy 05-14-2012.pdf
| 05/14/2012 |
Download
|
|
TAC 0198 <> Attachment Technical Infeasibility Determination Policy Approved 02-17-2012 Ltr.pdf
| 02/17/2012 |
Download
|
|
TAC 0199 Detectable Warning Panel Width 05-09-2012.pdf
| 05/09/2012 |
Download
|
|
TAC 0200 Quest Estimates (TAC 0120 October 29, 2008) 04-27-2012.pdf
| 04/27/2012 |
Download
|
|
TAC 0201 Complete Streets Design Consideration 07-11-2012.pdf
| 07/11/2012 |
Download
|
|
TAC 0202 Project History for RIDOT Design Contracts 06-08-2012.pdf
| 06/08/2012 |
Download
|
|
TAC 0203 <> Attach Form FHWA 1273 05-01-2012.pdf
| 05/01/2012 |
Download
|
|
TAC 0203 Form FHWA 1273 07-03-2012.pdf
| 07/03/2012 |
Download
|
|
TAC 0204 Miscellaneous Expenses - Mileage Reimbursement Increase 07-31-2012.pdf
| 07/31/2012 |
Download
|
|
TAC 0205 <> HMA - Matrix for Mix Designations Rev September 10 2012.pdf
| 09/10/2012 |
Download
|
|
TAC 0205 Hot Mix Asphalt - Matrix for Mix Designations Rev September 10 2012 09-12-2012.pdf
| 09/12/2012 |
Download
|
|
TAC 0206 Job Specific Specification Materials Testing Requirement 09-13-2012.pdf
| 09/13/2012 |
Download
|
|
TAC 0207 RI Standard Details Revised and New 9-25-2012.pdf
| 10/12/2012 |
Download
|
|
TAC 0207 <> Index Pages 10-12-2012.pdf
| 10/12/2012 |
Download
|
|
TAC 0207 <> Std Dets Approved 09-25-2012.pdf
| 10/12/2012 |
Download
|
|
TAC 0208 SUPERSEDED BY TAC 0254 Mob-Demob and Retainage in RIDOT Conts 10-18-2012.pdf
| 10/18/2012 |
Download
|
|
TAC 0209 Clarification on Buy America and Manufactured Products 01-03-2013.pdf
| 01/03/2013 |
Download
|
|
TAC 0210 <> Worksheet for Consultant Salary Rates.xlsx
| 01/07/2013 |
Download
|
|
TAC 0210 Guide Implement New Max Allowable Rate on Exist Contracts 01-07-2013 (SUPERCEDED TAC 0410)
| 01/07/2013 |
Download
|
|
TAC 0211 SUPERSEDED BY TAC 0244 Miscellaneous Expenses - Mileage Reimbursement Increase 01-16-2013
| 01/16/2013 |
Download
|
|
TAC 0212 Geotechnical Environmental Boring Logs and GeoInfo Database (TAC 0101 10-31-2007) 03-08-201
| 03/08/2013 |
Download
|
|
TAC 0213 <> Attachment Consultant Retainage Survey-BP.xlsx
| 02/04/2013 |
Download
|
|
TAC 0213 Design Contract Retainage Survey 02-04-2013.pdf
| 02/04/2013 |
Download
|
|
TAC 0214 Correspondence to Utility Companies for RIDOT Projects 02-08-2013 SUPERSEDED.pdf
| 02/08/2013 |
Download
|
|
TAC 0215 Utility Pole Setting Responsibility 02-12-2013.pdf
| 02/12/2013 |
Download
|
|
TAC 0216 Correspondence to Utility Companies for RIDOT Projects 02-15-2013.pdf
| 02/15/2013 |
Download
|
|
TAC 0217 Bridge Inspection Project Manager 02-26-2013.pdf
| 02/26/2013 |
Download
|
|
TAC 0218 RIDOT Vertical Datum Policy Change 04-27-2013.pdf
| 04/27/2013 |
Download
|
|
TAC 0219 <> Form to Provide Aerial Photography and Mapping Services Rev June 2013.pdf
| 06/10/2013 |
Download
|
|
TAC 0219 <> Form to Provide Survey Services Rev June 2013.pdf
| 06/10/2013 |
Download
|
|
TAC 0219 Survey and Mapping Professional Services - Proposals Revised June 2013 06-10-2013.pdf
| 06/10/2013 |
Download
|
|
TAC 0220 Responsibility to Deliver Submissions Work Products or Elements Thereof 04-04-2013.pdf
| 04/04/2013 |
Download
|
|
TAC 0221 Constructability Review Evaluation 04-08-2013.pdf
| 04/08/2013 |
Download
|
|
TAC 0222 PMP Apparent PMP Logon Issue When Using Internet Explorer Version 10 05-24-2013.pdf
| 05/24/2013 |
Download
|
|
TAC 0223 Materials Requirement for Job Specific Project Specifications 06-19-2013.pdf
| 06/19/2013 |
Download
|
|
TAC 0224 Compilation of Approved Specifications August 2013 08-07-2013.pdf
| 08/07/2013 |
Download
|
|
TAC 0225 RI Standard Detail Index and New Detail 08-07-2013.pdf
| 08/07/2013 |
Download
|
|
TAC 0226 <> JS 109.04 JS 08-09-2013.pdf
| 08/09/2013 |
Download
|
|
TAC 0226 Job Specific Provision 109.04 Differing Site Conditions 08-09-2013.pdf
| 08/09/2013 |
Download
|
|
TAC 0227 RI Standard Specifications and Standard Details - Cover Sheet Reference 08-22-2013.pdf
| 08/22/2013 |
Download
|
|
TAC 0228 <> Part 100 08-29-2013.pdf
| 08/29/2013 |
Download
|
|
TAC 0228 <> Table of Contents 08-29-2013.pdf
| 08/29/2013 |
Download
|
|
TAC 0228 RI Standard Specifications for Road and Bridge Construction Part 100 09-03-2013.pdf
| 09/03/2013 |
Download
|
|
TAC 0229 Hazardous Materials Studies MPA No 309 - Environmental Technical Assistance 09-06-2013.pdf
| 09/06/2013 |
Download
|
|
TAC 0230 MPA No 476 - Cultural Resources Consultant Services 09-06-2013.pdf
| 09/06/2013 |
Download
|
|
TAC 0231 Job Specific Provisions 09-09-2013.pdf
| 09/09/2013 |
Download
|
|
TAC 0232 <> Division 9 Appendix HDM 9A ADA Basic Needs September 27 2013.pdf
| 09/27/2013 |
Download
|
|
TAC 0232 <> Division 9 Pedestrian and Bicycle Facilities Rev 2013-09-27.pdf
| 09/27/2013 |
Download
|
|
TAC 0232 Highway Design Manual Div 9 Rev 9-27-2013 09-27-2013.pdf
| 09/27/2013 |
Download
|
|
TAC 0233 RIDOT Bridge Inspection Manual October 2013 10-16-2013.pdf
| 10/16/2013 |
Download
|
|
TAC 0234 Designing Walkable Urban Throughfares A Contex Sensitive Approach ITE 2010 2013 10-24-2013
| 10/24/2013 |
Download
|
|
TAC 0235 SUPERSEDED BY TAC 0237 MPA 489 - On-Call Natural Resources Consultant Services 11-01-2013
| 11/01/2013 |
Download
|
|
TAC 0236 Consideration of Use of Proven Crash Countermeasures 11-02-13 SUPERSEDED BY TAC 0431
| 11/02/2013 |
Download
|
|
TAC 0237 MPA 489 - On-Call Natural Resources Consultant Services 11-07-2013.pdf
| 11/07/2013 |
Download
|
|
TAC 0238 Job Specific Provision 601.03.7B-H Engineer's Acceptance Sampling Superseded by TAC 0246
| 11/08/2013 |
Download
|
|
TAC 0239 Correspondence to Contract Administration Office 11-25-2013.pdf
| 11/25/2013 |
Download
|
|
TAC 0240 Computation BackUp for Contract Quantites 12-27-2013.pdf
| 12/27/2013 |
Download
|
|
TAC 0241 RIDOT Federal Funding Program Workshop 01-02-2014.pdf
| 01/02/2014 |
Download
|
|
TAC 0242 NTSB Safety Recomentdation for Adhesive Anchors 01-15-2014.pdf
| 01/15/2014 |
Download
|
|
TAC 0243 Incorporation of Existing Plans in Advertising Documents 01-15-2014.pdf
| 01/15/2014 |
Download
|
|
TAC 0244 Miscellaneous Expenses - Mileage Reimbursement Decrease 01-23-2014
| 01/23/2014 |
Download
|
|
TAC 0245 <> Appendix A.pdf
| 01/27/2014 |
Download
|
|
TAC 0245 RIDOT Title VI Assurance - Appendix A 01-27-2014
| 01/27/2014 |
Download
|
|
TAC 0246 <> Attach JS 601_03_7 and JS 601_05 January 28 2014 01-28-2014.pdf
| 01/28/2015 |
Download
|
|
TAC 0246 Job Specific Provision 601_03_7B-H Engineer's Acceptance Sampling Testing and Inspection 6
| 01/28/2014 |
Download
|
|
TAC 0247 <> APS Policy December 6, 2013
| 12/06/2013 |
Download
|
|
TAC 0247 APS Policy December 6, 2013 02-03-2014
| 02/03/2014 |
Download
|
|
TAC 0248 Coordination with the Utility Companies regarding Traffic Related Work Restric 02-05-2014
| 02/05/2014 |
Download
|
|
TAC 0249 <> Project Limit Data Excel Worksheet sample
| 03/03/2013 |
Download
|
|
TAC 0249 Project Limit Data Excel Worksheet
| 03/03/2014 |
Download
|
|
TAC 0249 Project Limit Data for Addition to the PMP System 02-26-2014
| 02/26/2014 |
Download
|
|
TAC 0250 <> Bridge Design for Rhode Island Legal Loads Attachment 02-27-2014
| 02/27/2014 |
Download
|
|
TAC 0250 Bridge Design for Rhode Island Legal Loads 02-27-2014
| 02/27/2014 |
Download
|
|
TAC 0251 Bridge Design for Rhode Island Legal Loads (Supplement to TAC-0250) 03-20-2014.pdf
| 03/20/2014 |
Download
|
|
TAC 0252 <> 90% Review Meeting Checklist - Rev 03-24-2014 Editable.xls
| 03/24/2014 |
Download
|
|
TAC 0252 90% Review Meeting Checklist 03-24-2014.pdf
| 03/24/2014 |
Download
|
|
TAC 0253 <> COVER Rev APR 2014.pdf
| 04/24/2014 |
Download
|
|
TAC 0253 <> STDNOTES01 Rev3 APR 2014.pdf
| 04/24/2014 |
Download
|
|
TAC 0253 <> XXXXX_V1_001_COVER_REV_APR_2014.dwg
| 04/30/2014 |
Download
|
|
TAC 0253 <> XXXXX_V1_003_STDNOTES01_REV3.dwg
| 04/24/2014 |
Download
|
|
TAC 0253 Notation and Location of Vertical and Horizontal Datum Information, Cover and Standard Note
| 04/24/2014 |
Download
|
|
TAC 0254 SUPERSEDED BY TAC 0262 Mob and Dem and Retainage in RIDOT Contracts 06-20-2014.pdf
| 06/20/2014 |
Download
|
|
TAC 0255 Financial Statements for Professional Services Contracts 08-04-2014.pdf
| 08/04/2014 |
Download
|
|
TAC 0256 Diamond Grinding Exposed Concrete Bridge Decks 09-10-2014.pdf
| 09/10/2014 |
Download
|
|
TAC 0257 <> Attachment RI Standard Detail Index Revised Details and New Detail 09-15-2014.pdf
| 09/15/2014 |
Download
|
|
TAC 0257 RI Standard Details 1998 Edition Revised Index Pages, New and Revised Standard Details 09-1
| 09/15/2014 |
Download
|
|
TAC 0258 Minimum Acceptable Bid Price for Item Code 914.5010 Flagpersons and Item Code 914.5020 Flag
| 09/23/2014 |
Download
|
|
TAC 0259 Standard Specifications for Road and Bridge Construction, Part 100 JS Provision 109.04, Oc
| 10/03/2014 |
Download
|
|
TAC 0260 Attachment Consultant Retainage Survey-BP.pdf
| 12/15/2014 |
Download
|
|
TAC 0260 Attachment Consultant Retainage Survey-BP.xlsx
| 12/15/2014 |
Download
|
|
TAC 0260 Design Contract Retainage Survey 12-15-2014a.pdf
| 12/15/2014 |
Download
|
|
TAC 0261 Attachment EXAMPLE OF AUDIT REPORT WITH NEW LANGUAGE.pdf
| 12/17/2014 |
Download
|
|
TAC 0261 Attachment REVISED_RIDOT External Audit 12 2014.pdf
| 12/17/2014 |
Download
|
|
TAC 0261 Audit Report Issuance and Dispute Resolution 12-17-2014.pdf
| 12/17/2014 |
Download
|
|
TAC 0262 <> Attachment 12 108 01.pdf
| 06/20/2014 |
Download
|
|
TAC 0262 <> Attachment 12 109 06.pdf
| 06/20/2014 |
Download
|
|
TAC 0262 <> Attachment 12 109 09.pdf
| 06/20/2014 |
Download
|
|
TAC 0262 Mobilization and Demobilization and Retainage in RIDOT Contracts 01-07-2015.pdf
| 01/07/2015 |
Download
|
|
TAC 0263 <> DefaultStdItemsList 011415.pdf
| 01/14/2015 |
Download
|
|
TAC 0263 <> Item Code Changes 011315.pdf
| 01/13/2015 |
Download
|
|
TAC 0263 Quest Standard Item Code Revisions 01-14-2015.pdf
| 01/14/2015 |
Download
|
|
TAC 0264 Miscellaneous Expenses - Mileage Reimbursement Increase 01-16-2015.pdf
| 01/16/2015 |
Download
|
|
TAC 0265 <> Attachment Job Specific Specifications Approval Form 02-20-2015.pdf
| 02/20/2015 |
Download
|
|
TAC 0265 <> Attachment Proposed Job Specific Specification Lista 02-20-2015.pdf
| 02/20/2015 |
Download
|
|
TAC 0265 Approval Form and List for Job Specific Specifcations 02-23-2015a.pdf
| 02/23/2015 |
Download
|
|
TAC 0266 <> Attachment Design Project Financial Data.xlsx
| 03/11/2015 |
Download
|
|
TAC 0266 Design Project Financial Data 03-11-2015.pdf
| 03/11/2015 |
Download
|
|
TAC 0267 <> Attachment List Correspondence to Utility Companies for RIDOT Projects - 02-09-2015.pdf
| 02/09/2015 |
Download
|
|
TAC 0267 Atch List Corr Utility Co for RIDOT PK - Utility Contact 2015-01-09-SUPERSEDED
| 02/09/2015 |
Download
|
|
TAC 0267 Corr to Utility Companies for RIDOT Projects list 02-09-2015, 03-12-2015 SUPERSEDED.pdf
| 03/12/2015 |
Download
|
|
TAC 0268 <> Attachment DPM 220.06 Revised 3-16-2015 Project Tracking System (PTS) Numbers.pdf
| 03/16/2015 |
Download
|
|
TAC 0268 DPM 220.06 Revised 3-16-2015 Project Tracking System (PTS) Numbers, 03-26-2015.pdf
| 03/26/2015 |
Download
|
|
TAC 0269 <> Attachment 2015_National_Compensation_Matrix (FINAL 2-13-2015).xls
| 02/13/2015 |
Download
|
|
TAC 0269 <> Attachment Front Page.pdf
| 04/17/2015 |
Download
|
|
TAC 0269 <> Attachment View.pdf
| 04/17/2015 |
Download
|
|
TAC 0269 2015 National Compensation Matrix (NCM) 04-17-2015 .pdf
| 04/17/2015 |
Download
|
|
TAC 0270 Design Contracts with Past or Approaching PO End Dates 04-30-2015.pdf
| 04/30/2015 |
Download
|
|
TAC 0271 <> Atch Compilation of Approved Specifications, Supplement No 15 April 2015.pdf
| 04/28/2015 |
Download
|
|
TAC 0271 <> Atch RI Std Detail 43_3_2 03-31-2015 Large.pdf
| 03/31/2015 |
Download
|
|
TAC 0271 <> Atch Standard Detail Index Pages May 2015.pdf
| 05/20/2015 |
Download
|
|
TAC 0271 Compilation of Approved Specification, 05-20-2015.pdf
| 05/20/2015 |
Download
|
|
TAC 0271 Compilation of Approved Specifications -April 2015.pdf
| |
Download
|
|
TAC 0272 <> Atch Compilation of Approved Specifications, Supplement No 16 May 2015.pdf
| 05/07/2015 |
Download
|
|
TAC 0272 Compilation of Approved Specification, 05-22-2015.pdf
| 05/22/2015 |
Download
|
|
TAC 0273 <> Sample Permanent Bikeway Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> Sample Permanent Sidewalk Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> Sample Permanent Traffic Signal Control Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> Sample Permanent Underground Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> Sample Permanent Utility Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> SUPERCEDED BY TAC 0377 Sample Highway May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> SUPERCEDED by TAC 0377 Sample Highway-Freeway May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> SUPERCEDED by TAC 0377 Sample Permanent Aerial Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> SUPERCEDED by TAC 0377 Sample Permanent Drainage Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> SUPERCEDED by TAC 0377 Sample Permanent Guy Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 <> SUPERCEDED by TAC 0377 Sample Temporary Highway Easement May 2015.pdf
| 05/01/2015 |
Download
|
|
TAC 0273 DPM 450_10 ROW Sample Documents Revised May 1 2015 06-01-2015.pdf
| 06/01/2015 |
Download
|
|
TAC 0274 Discontinued - Advance Authorization for Engineering Services Form, 2016 01-14-2016.pdf
| 01/14/2016 |
Download
|
|
TAC 0275 Job Specific Specification Materials Testing Requirements 2015 08-26-2015.pdf
| 08/26/2015 |
Download
|
|
TAC 0276 <> Attachment RIDOT External Audit TAC rev12 2015.pdf
| 12/29/2015 |
Download
|
|
TAC 0276 Audit Report Issuance and Dispute Resolution 12-29-2015.pdf
| 12/29/2015 |
Download
|
|
TAC 0277 RI Bridge Design Standard Details and CADD Drawings, Revised 2015, 10-09-2015.pdf
| 10/09/2015 |
Download
|
|
TAC 0278 <> Atch Design Invoice Template 10_30_2015.pdf
| 10/30/2015 |
Download
|
|
TAC 0278 <> Atch Design Invoice Template 10_30_2015.xls
| 10/30/2015 |
Download
|
|
TAC 0278 Separate Remaining Hours Authorized Funds per PTSID, 11-13-2015.pdf
| 11/13/2015 |
Download
|
|
TAC 0279 <> Attachment Job Specific Specification SECTION 928 TMA with TMFAB, 02-09-2016 02-11-2016
| 02/09/2016 |
Download
|
|
TAC 0279 Job Specific Specification SECTION 928 TMA with TMFAB , 02-09-2016 02-11-2016.pdf
| 02/11/2016 |
Download
|
|
TAC 0280 Attachment Noise Abatement Guidance, 03-04-2016.pdf
| 03/04/2016 |
Download
|
|
TAC 0280 Attachment Noise Abatement Policy, 03-04-2016.pdf
| 03/04/2016 |
Download
|
|
TAC 0280 RIDOT Noise Abatement Policy Guidance, 03-04-2016.pdf
| 03/04/2016 |
Download
|
|
TAC 0281 Atch RIGL 31-47_3-5 Diesel Emissions Reduction Program Compilation04222016.pdf
| 04/22/2016 |
Download
|
|
TAC 0281 Atch Section 944 Diesel Emissions Reduction Program Compilation 16May201504222016.pdf
| 04/22/2016 |
Download
|
|
TAC 0281 Atch Statement of Intent to Comply Diesel Emissions Reduction Program04222016.pdf
| 04/22/2016 |
Download
|
|
TAC 0281 Diesel Emissions Reduction Program04222016.pdf
| 04/22/2016 |
Download
|
|
TAC 0282 <> Atch 90% Review Meeting Checklist - Rev 04-22-2016 Editable.pdf
| 04/22/2016 |
Download
|
|
TAC 0282 <> Atch 90% Review Meeting Checklist - Rev 04-22-2016 Editable.xls
| 04/22/2016 |
Download
|
|
TAC 0282 90% Review Meeting Checklist Rev 04-22-2016, 04-22-2016.pdf
| 04/22/2016 |
Download
|
|
TAC 0283 <> Atch Audit Policy Statement April 22, 2016, 04-22-2016.pdf
| 04/22/2016 |
Download
|
|
TAC 0283 Audit Policy Statement April 22, 2016, 04-22-2016.pdf
| 04/22/2016 |
Download
|
|
TAC 0284 <> Attachment Compilation of Approved Specifications Supp No 17, May 6, 2016 05-18-2016.pdf
| 05/06/2016 |
Download
|
|
TAC 0284 <> Attachment Compilation of Approved Specifications, April 22, 2016 05-18-2016.pdf
| 04/22/2016 |
Download
|
|
TAC 0284 Compilations of Approved Specifications, April 22, 2018, May 6, 2016 05-18-2016.pdf
| 05/18/2016 |
Download
|
|
TAC 0285 <> Attachment Corr to Utility Co for RIDOT Projects list 05-05-2016 SUPERSEDED.pdf
| 05/05/2016 |
Download
|
|
TAC 0285 Corr to Utility Companies for RIDOT Projects list 05-05-2016, 05-27-2016 SUPERSEDED.pdf
| 05/27/2016 |
Download
|
|
TAC 0286 Requirements listed under Section 601.03.7(a), 06-24-2016.pdf
| 06/24/2016 |
Download
|
|
TAC 0287 <> Attachment ICR Communication.pdf
| 06/30/2016 |
Download
|
|
TAC 0287 Indirect Cost Rate (ICR) - Office of Internal Audit (OIA) is conducting audits of design c
| 06/29/2016 |
Download
|
|
TAC 0288 <> Attachment JS 109 06 Payment for Work, 07-06-2016.pdf
| 07/06/2016 |
Download
|
|
TAC 0288 Job Specific Specification 109.06 PAYMENT FOR WORK, July 06, 2016, 07-06-2016a.pdf
| 07/06/2016 |
Download
|
|
TAC 0289 Physical Alteration Permit Application Documents, Revised 12-20-2016, 12-20-2016.pdf
| 12/20/2016 |
Download
|
|
TAC 0290 <> Attachment Amended Plat Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
TAC 0290 <> Attachment Condemnation Plat Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
TAC 0290 <> Attachment Conveyance Plat Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
TAC 0290 <> Attachment Right of Way Plan Template 12-22-16.dwt
| 12/22/2016 |
Download
|
|
TAC 0290 <> PDF Amended Plat Template 12-22-16-12x36 SFL Plat Cover Sheet_40 Scale.pdf
| 12/22/2016 |
Download
|
|
TAC 0290 <> PDF Condemnation Plat Template 12-22-16 12x36 SHL Plat Cover (1).pdf
| 12/22/2016 |
Download
|
|
TAC 0290 <> PDF Conveyance Plat Template 12-22-16-12x36 Conveyance Plat Cover Sheet_40 Scale.pdf
| 12/22/2016 |
Download
|
|
TAC 0290 <> PDF Right of Way Plan Template 12-22-16-XXXXX_V1_001_COVER.pdf
| 12/22/2016 |
Download
|
|
TAC 0290 Revised Plat Sheets December 22, 2016, 12-22-2016.pdf
| 12/22/2016 |
Download
|
|
TAC 0291 <> Attachment Revised Utility Contact list 02-16-2017.pdf
| 02/16/2017 |
Download
|
|
TAC 0291 Correspondence to Utility Companies for RIDOT Projects list 02-16-2017, 02-20-2017.pdf
| 02/20/2017 |
Download
|
|
TAC 0292 Revised Bridge Load Rating Guidelines Rev No 2 March 2017, 03-01-2017.pdf
| 03/01/2017 |
Download
|
|
TAC 0292 <> Attachment Revised Bridge Load Rating Guidelines Rev No 2 March 2017, 03-01-2017.pdf
| 03/01/2017 |
Download
|
|
TAC 0293 Plan Cover Sheet Signatory Titles, 03-28-2017.pdf
| 03/28/2017 |
Download
|
|
TAC 0294 Indirect Cost Rates (ICR) for State Funded Projects - April 1, 2017, 03-31-2017.pdf
| 03/31/2017 |
Download
|
|
TAC 0295 SUPERSEDED BY TAC 0297 <> Attachment Audit Policy Statement April 6, 2017.pdf
| 04/06/2017 |
Download
|
|
TAC 0295 SUPERSEDED BY TAC 0297 Audit Policy Statement April 6, 2017, 04-12-2017.pdf
| 04/12/2017 |
Download
|
|
TAC 0296 Attachment JS Section 926 Anchored and Unanchored Barrier for Temporary Traffic Control on
| 05/12/2017 |
Download
|
|
TAC 0296 Anchored and Unanchored Barrier for Temporary Traffic Control on Bridges 05122017.pdf
| 05/12/2017 |
Download
|
|
TAC 0297 SUPERSEDED <> Attachment Audit Policy Statement May 2017.pdf
| 05/26/2017 |
Download
|
|
TAC 0297 SUPERSEDED Audit Policy Statement May 2017, 05-26-2017.pdf
| 05/26/2017 |
Download
|
|
TAC 0298 SUPERSEDED By TAC 0347 Design Loads for simple and continuous span bridges at the Strength
| 06/25/2017 |
Download
|
|
TAC 0299 <> Attachment Bridge Load Rating Guidelines, August 2017, 08-11-2017.pdf
| 08/11/2017 |
Download
|
|
TAC 0299 Bridge Load Rating Guidelines, August 2017, 08-11-2017.pdf
| 08/11/2017 |
Download
|
|
TAC 0300 <> Attachment DBE Liaison and PRISM Introduction December 20, 2017, 12-21-2017.pdf
| 12/20/2017 |
Download
|
|
TAC 0300 DBE Liaison and PRISM Introduction December 20, 2017, 12-21-2017.pdf
| 12/21/2017 |
Download
|
|
TAC 0301 <> Attachment Lump Sum Survey Proposal August 2017, 08-28-2017.pdf
| 08/28/2017 |
Download
|
|
TAC 0301 Lump Sum Survey Proposal August 2017, 08-28-2017.pdf
| 08/28/2017 |
Download
|
|
TAC 0302 MASH Accepted Hardware on RIDOT Projects January 25, 2018, 01-25-2018.pdf
| 01/25/2018 |
Download
|
|
TAC 0303 <> Attachment Separation of Hours Between Design and Construction Phases, 02-14-2018 LF.pdf
| 02/14/2018 |
Download
|
|
TAC 0303 Separation of Hours Between Design and Construction Phases, 02-14-2018 LF.pdf
| 02/14/2018 |
Download
|
|
TAC 0304 <> Attachment EXAMPLE Pedestrian Timing Calculation Sheet.pdf
| 03/09/2018 |
Download
|
|
TAC 0304 <> Attachment Pedestrian Signal Timing Calculation Sheet v1a 03-09-18.xlsx
| 03/09/2018 |
Download
|
|
TAC 0304 Attachment EXAMPLE Pedestrian Timing Calculation Sheet.pdf
| 03/09/2018 |
Download
|
|
TAC 0304 Attachment Pedestrian Signal Timing Calculation Sheet v1a 03-09-18.xlsx
| 03/09/2018 |
Download
|
|
TAC 0304 Pedestrian Signal Timing Calculating Sheet 03-09-18, 03-12-2018.pdf
| 03/12/2018 |
Download
|
|
TAC 0305 SUPERSEDED <> Attachment Audit Policy Statement March 27, 2018.pdf
| 03/27/2018 |
Download
|
|
TAC 0305 SUPERSEDED Audit Policy Statement March 27, 2018, 03-28-2018.pdf
| 03/28/2018 |
Download
|
|
TAC 0306 <> Attachment Compilations of Approved Specifications, Supplemant No 18 March 27, 2018.pdf
| 03/27/2018 |
Download
|
|
TAC 0306 Compilations of Approved Specifications, Supplemant No 18 March 27, 2018, 04-27-2018.pdf
| 04/27/2018 |
Download
|
|
TAC 0307 <> Attachment RI Standard Detail Nos 20_3_0 and 20_4_0, New 03-27-2018.pdf
| 03/27/2018 |
Download
|
|
TAC 0307 <> Attachment RI Standard Details Index Pages Rev 03-30-2018.pdf
| 03/30/2018 |
Download
|
|
TAC 0307 RI Standard Details and Std Det Index Pages March 27, 30, 2018, 04-27-2018.pdf
| 03/27/2018 |
Download
|
|
TAC 0308 <> Attachment Job Specific Specification 109.06 PAYMENT FOR WORK April 26, 2018.pdf
| 04/26/2018 |
Download
|
|
TAC 0308 Job Specification 109.06 PAYMENT FOR WORK April 26, 2018, 05-11-2018.pdf
| 04/26/2018 |
Download
|
|
TAC 0309 <> Attachment MASH w-beam to existing new bridge end post replacement of tangent end termi
| 07/12/2018 |
Download
|
|
TAC 0309 MASH w-beam to existing new bridge end post and replacement of tangent end terminals 07-12-
| 07/12/2018 |
Download
|
|
TAC 0310 <> Attachmant Compilations of Approved Specifications, Supplemant No 19 July 13, 2018, 07-
| 07/13/2018 |
Download
|
|
TAC 0310 Compilations of Approved Specifications, Supplemant No 19 July 13, 2018, 07-13-2018.pdf
| 07/13/2018 |
Download
|
|
TAC 0311 Job Specification 827.99XX Hot-Dip Galvanizing and Factory-Applied Color Finish, July 10, 2018, 07-18-2018.pdf
| |
Download
|
|
TAC 0311 SUPERSEDED BY TAC 0319 <> Attachment Job Specification 827.99XX Hot-Dip Galvanizing and F
| 07/10/2018 |
Download
|
|
TAC 0311 SUPERSEDED BY TAC 0319 Job Specification 827.99XX Hot-Dip Galvanizing and Factory-Appl
| 07/17/2018 |
Download
|
|
TAC 0312 <> Attachment Utility Coordination 08-23-2018.pdf
| 08/23/2018 |
Download
|
|
TAC 0312 Utility Coordination August 23, 2018, 08-23-2018.pdf
| 08/23/2018 |
Download
|
|
TAC 0313 <> Attachment Blue Book Amended 2018.pdf
| 03/31/2018 |
Download
|
|
TAC 0313 Blue Book 2004 Edition Amended March 2018 09-26-2018.pdf
| 09/26/2018 |
Download
|
|
TAC 0314 Attachment Compilation of Approved Specifications September 20-20181022.pdf
| |
Download
|
|
TAC 0314 Compilation of Approved Specifications September 20-20181022.pdf
| 10/22/2018 |
Download
|
|
TAC 0315 Attachment Coordination of Submissions requiring Scenic Roadway Board Review January 9-2019
| 01/09/2019 |
Download
|
|
TAC 0315 Coordination of Submissions requiring Scenic Roadway Board Review January 9-20190109.pdf
| 01/09/2019 |
Download
|
|
TAC 0316 Topcoat colors for painted structures01092019.pdf
| 01/09/2019 |
Download
|
|
TAC 0317 Attachment Update to TAC 0302 MASH Accepted Hardware on RIDOT Projects January 30-20181220.
| 12/22/2018 |
Download
|
|
TAC 0317 Update to TAC 0302 MASH Accepted Hardware on RIDOT Projects January 30-20190130.pdf
| 01/30/2019 |
Download
|
|
TAC 0318 Implementation of Permit Engineering Office Mailbox January 24-20190124.pdf
| 01/24/2019 |
Download
|
|
TAC 0319 Attachment Job Specification 827.99XX Hot-Dip Galvanizing and Factory-Applied Color Finish
| 07/01/2018 |
Download
|
|
TAC 0319 Attachment Job Specification 827.99XX Hot-Dip Galvanizing and Factory-Applied Color Finish July102018.pdf
| |
Download
|
|
TAC 0319 Job Specification 827 99XX Hot-Dip Galvanizing and Factory-Applied Color FinishMarch012019
| 03/01/2019 |
Download
|
|
TAC 0320 <> Attachment Mobilization and Demobilization February 21, 2019 02-21-2019.pdf
| 02/21/2019 |
Download
|
|
TAC 0320 SUPERSEDED BY TAC 0321 Mobilization and Demobilization 02-21-2019.pdf
| 02/21/2019 |
Download
|
|
TAC 0321 Attachment Mobilization and Demobilization 03-12-2019.pdf
| 03/12/2019 |
Download
|
|
TAC 0321 Mobilization and Demobilization March 12, 2019 03-12-2019.pdf
| 03/12/2019 |
Download
|
|
TAC 0322 <> Attachment Job Specific Specification list 05-13-2019 corrected 05-16-2019.pdf
| 05/16/2019 |
Download
|
|
TAC 0322 Job Specific Specification List May 13, 2019 05-13-2019.pdf
| 05/13/2019 |
Download
|
|
TAC 0323 Attachment TEMPLATE Contractor Invoicing.xlsx
| 03/26/2019 |
Download
|
|
TAC 0323 Attachment Subsection 109.06 Payment for Work 03-26-2019.pdf
| 02/26/2019 |
Download
|
|
TAC 0323 Subsection 109.06 Payment for Work March 26, 2019 03-28-2019.pdf
| 03/28/2019 |
Download
|
|
TAC 0324 SUPERSEDED BY TAC 0349 MASH - Temporary Barrier for Traffic Control April 2, 2019.pdf
| 02/02/2019 |
Download
|
|
TAC 0325 Load Ratings of Temporary Bridge Structures April 11 2019.pdf
| 04/11/2019 |
Download
|
|
TAC 0326 SUPERSEDED BY TAC 0357 Traffic Counts April 12, 2019.pdf
| 04/12/2019 |
Download
|
|
TAC 0327 SUPERSEDED BY TAC 0354 Compliance Checklist May 23, 2019 05-23-2019.pdf
| 05/23/2019 |
Download
|
|
TAC 0327 SUPERSEDED BY TAC 0354<> Attachment Compliance Checklist, 05-23-2019.xlsx
| 05/23/2019 |
Download
|
|
TAC 0328 <> Attachment Default Standard Items List Quest Std Item Code Revisions, June 17, 2019.pd
| 06/17/2019 |
Download
|
|
TAC 0328 <> Attachment Newly Added - Recently Retired Quest Standard Item Code Revisions, June 17, 2
| 06/17/2019 |
Download
|
|
TAC 0328 Quest Standard Item Code Revisions, June 20, 2019.pdf
| 06/20/2019 |
Download
|
|
TAC 0329 Attachment Compilation of Approved Specifications Supplement No 20June2019.pdf
| 11/20/2019 |
Download
|
|
TAC 0329 Compilation of Approved Specifications Supplement No 20June201906202019.pdf
| 06/20/2019 |
Download
|
|
TAC 0330 <> Attachment Index Pages 06-21-2019.pdf
| 06/21/2019 |
Download
|
|
TAC 0330 <> Attachment RI Std Detail 19_2_0 R1 Steel Mast Arm.pdf
| 05/28/2019 |
Download
|
|
TAC 0330 <> Attachment RI Std Detail 19_5_0A MAST ARM FOUNDATION - DETAILS.pdf
| 05/28/2019 |
Download
|
|
TAC 0330 <> Attachment RI Std Detail 19_5_0B MAST ARM FOUNDATION - DESIGN TABLE.pdf
| 05/28/2019 |
Download
|
|
TAC 0330 <> Attachment RI Std Detail 19_5_0C MAST ARM FOUNDATION - NOTES.pdf
| 05/28/2019 |
Download
|
|
TAC 0330 Approved Standard DetailsMay201906212019.pdf
| 06/21/2019 |
Download
|
|
TAC 0331 <> Attachment HMA Matrix July 2019.pdf
| 07/24/2019 |
Download
|
|
TAC 0331 HMA Matrix 07242019.pdf
| 07/24/2019 |
Download
|
|
TAC 0331 HMA Matrix July 2019, July 24, 2019, 07-24-2019.pdf
| 07/24/2019 |
Download
|
|
TAC 0332 Attachment Plans and Shop Drawings Section081619.pdf
| 08/16/2019 |
Download
|
|
TAC 0332 Plans and Shop Drawings Section08162019.pdf
| 08/16/2019 |
Download
|
|
TAC 0333 Preparation of the Engineers Estimate, 08-26-2019.pdf
| 08/26/2019 |
Download
|
|
TAC 0334 New CAD Standards090619.pdf
| 09/06/2019 |
Download
|
|
TAC 0335 Attachment Patented Proprietary Products
| 10/23/2019 |
Download
|
|
TAC 0335 Patented Proprietary Products
| 10/23/2019 |
Download
|
|
TAC 0336 Attachment Value Eng. Policies Procedures
| 10/23/2019 |
Download
|
|
TAC 0336 Value Eng. Policies Procedures
| 10/23/2019 |
Download
|
|
TAC 0337 RIDOT Lane Closure Policy
| 10/18/2019 |
Download
|
|
TAC 0338 Hot Mix Asphalt (HMA) Matrix.pdf
| 11/20/2019 |
Download
|
|
TAC 0338 Hot Mix Asphalt HMA Matrix Attachment.pdf
| 11/15/2019 |
Download
|
|
TAC 0338 Hot Mix Asphalt HMA Matrix.pdf
| 11/15/2019 |
Download
|
|
TAC 0339 Bridge Load Rating Guidelines November 2019.pdf
| 11/18/2019 |
Download
|
|
TAC 0340 Prevailing Wage 02-10-20.pdf
| 02/10/2020 |
Download
|
|
TAC 0341 AASHTO Geometric Design Errata October 2019 01-14-20.pdf
| 01/14/2020 |
Download
|
|
TAC 0341 Attachment AASHTO Geometric Design Errata.pdf
| 01/14/2020 |
Download
|
|
TAC 0342 Overhead Utility Line Clearances 02-05-20.pdf
| 02/05/2020 |
Download
|
|
TAC 0343 - Work Zone Traffic Impact Analysis Tools.pdf
| 02/07/2020 |
Download
|
|
TAC 0344 Attachment FHWA Eligibility Letter 12-27-16 Guardrail on Scenic Roadways.pdf
| 02/12/2020 |
Download
|
|
TAC 0344 Guardrail on Scenic Roadways 02-12-20.pdf
| 02/12/2020 |
Download
|
|
TAC 0345 Attachment MASH - Replacement of End Terminals, Installation of New End Terminals, and Rub
| 02/12/2020 |
Download
|
|
TAC 0345 Attachment MASH - Replacement of End Terminals, Installation of New End Terminals, and Rub Rail Use on RIDOT Projects.pdf
| |
Download
|
|
TAC 0345 MASH - Replacement of End Terminals, Installation of New End Terminals, and Rub Rail Use on
| 02/12/2020 |
Download
|
|
TAC 0346 DPM 480.01 Geotechnical Environmental Boring Logs and GeoInfo Database(TAC 0101)02-06-20.pd
| 02/06/2020 |
Download
|
|
TAC 0347 Design Loads for Bridges 02-28-20.pdf
| 02/28/2020 |
Download
|
|
TAC 0348 Policy on use of Adjacent Precast Box Beam and Slab Bridges 03-20-20.pdf
| 03/20/2020 |
Download
|
|
TAC 0349 MASH - Temporary Barrier for Traffic Control 04-07-20.pdf
| 04/07/2020 |
Download
|
|
TAC 0350 Lane Closure-Lane Split Coordination Policy 04-28-20.pdf
| 04/28/2020 |
Download
|
|
TAC 0351 SUPERSEDED Attachment SubSections 206-212 Erosion Controls 05-12-20
| 05/12/2020 |
Download
|
|
TAC 0351 SUPERSEDED SubSections 206-212 Erosion Controls 05-12-20.pdf
| 05/12/2020 |
Download
|
|
TAC 0352 Attachment 1 Improvement Type Codes February 28, 2003 05-12-20.pdf
| 05/12/2020 |
Download
|
|
TAC 0352 Attachment 2 FMIS Improvement Type Codes 05-12-20.pdf
| 05/12/2020 |
Download
|
|
TAC 0352 Attachment 3 Copy of Example - Improvement Type Codes-rev2 06-01-20.pdf
| 06/01/2020 |
Download
|
|
TAC 0352 Attachment 4 Sample Engineers Estimate by FAP 05-12-20.pdf
| 05/12/2020 |
Download
|
|
TAC 0352 Updates on Improvement Type Codes 05-12-2020.pdf
| 05/12/2020 |
Download
|
|
TAC 0353 Release of Design Consultant Retainage 06-16-20.pdf
| 06/16/2020 |
Download
|
|
TAC 0354 Attachment 1 Bridge QCQAQV Plan06262020.pdf
| 06/26/2020 |
Download
|
|
TAC 0354 Attachment 2 Bridge QV Checklist062620.pdf
| 06/26/2020 |
Download
|
|
TAC 0354 Attachment 3 Compliance Checklist062620.pdf
| 06/26/2020 |
Download
|
|
TAC 0354 Attachment 4 Compliance Checklist062620.xlsx
| 06/26/2020 |
Download
|
|
TAC 0354 RIDOT QC QA QV Plan and Compliance Checklist06262020.pdf
| 06/26/2020 |
Download
|
|
TAC 0355 Attachment 1 Ocean State Procures Overview Sessions 06-15-20.pdf
| 06/15/2020 |
Download
|
|
TAC 0355 Statewide E-Procurement System 06-15-20.pdf
| 06/15/2020 |
Download
|
|
TAC 0356 Supplement to TAC 0296 - Anchored Barrier 03-10-21.pdf
| 03/10/2021 |
Download
|
|
TAC 0357 Traffic Counts 08-14-2020.pdf
| 08/14/2020 |
Download
|
|
TAC 0358 Bridge Material Information for RIDOT Bridge Ratings Section 08-13-2020.pdf
| 08/13/2020 |
Download
|
|
TAC 0359 Snow Plow Clearances 10-30-2020.pdf
| 10/30/2020 |
Download
|
|
TAC 0360 CE Project Narrative Guidance 10-27-2020.pdf
| 10/27/2020 |
Download
|
|
TAC 0361 90 Percent Plan Distribution 12-16-2020.pdf
| 12/16/2020 |
Download
|
|
TAC 0362 Removal of Bridge Weight Signs 12-21-2020.pdf
| 12/21/2020 |
Download
|
|
TAC 0363 SUPERCEDED BY TAC 0368 Bid Anaylsis Sample Memo 12-28-2020.doc
| 12/28/2020 |
Download
|
|
TAC 0363 SUPERSEDED By TAC 0368 Bid Analysis 12-28-2020.pdf
| 12/28/2020 |
Download
|
|
TAC 0364 - State Name Change 01-25-2021.pdf
| 01/25/2021 |
Download
|
|
TAC 0365 Attachment Compilation of Approved Specifications No 21 February 2021.pdf
| 02/19/2021 |
Download
|
|
TAC 0365 Compilation of Approved Specifcations Supplement No 21 02-19-21.pdf
| 02/19/2021 |
Download
|
|
TAC 0366 Reinforcement for Bridges 04-02-21.pdf
| 04/02/2021 |
Download
|
|
TAC 0367 Environmental Permitting Signatory 04-16-21.pdf
| 04/16/2021 |
Download
|
|
TAC 0368 Bid Analysis 06-02-21.pdf
| 06/02/2021 |
Download
|
|
TAC 0368 Bid Analysis Sample Memo 06-02-2021.doc
| 06/02/2021 |
Download
|
|
TAC 0369 Modifications to Warning Sign Shapes 05-05-2021.pdf
| 05/05/2021 |
Download
|
|
TAC 0370 Dotted Line Application for Exit Ramp Markings 05-05-2021.pdf
| 05/05/2021 |
Download
|
|
TAC 0371 Attachment 1 Bridge QCQAQV Plan05052021.pdf
| 05/15/2021 |
Download
|
|
TAC 0371 Attachment 2 Bridge QV Checklist05052021.pdf
| 05/15/2021 |
Download
|
|
TAC 0371 Revisions to QC QA QV Plan and QV Checklist 05-05-2021.pdf
| 05/05/2021 |
Download
|
|
TAC 0372 Friction Course on Bridge Decks 05-13-2021.pdf
| 05/13/2021 |
Download
|
|
TAC 0373 Attachment 1 Section 413.0001 Rideability - Surface Course 05172021.pdf
| 05/17/2021 |
Download
|
|
TAC 0373 Attachment 2 Section 416.0001 Pay Adjustments05172021.pdf
| 05/17/2021 |
Download
|
|
TAC 0373 Rideability05172021.pdf
| 05/17/2021 |
Download
|
|
TAC 0374 Attachment Hot Mix Asphalt HMA Matrix 07-15-2021.pdf
| 07/15/2021 |
Download
|
|
TAC 0374 Hot Mix Asphalt HMA Matrix 07-15-2021.pdf
| 07/15/2021 |
Download
|
|
TAC 0375 Bolt Finish 07-14-21.pdf
| 07/14/2021 |
Download
|
|
TAC 0376 Bridge Minimum Vertical Clearance Policy 8-30-21.pdf
| 08/30/2021 |
Download
|
|
TAC 0377 Sample Drainage Easement.docx
| 09/15/2021 |
Download
|
|
TAC 0377 Sample HIGHWAY.docx
| 09/15/2021 |
Download
|
|
TAC 0377 Sample Highway-Freeway Acquisition.doc
| 09/15/2021 |
Download
|
|
TAC 0377 Sample Permanent Aerial Easement.doc
| 09/15/2021 |
Download
|
|
TAC 0377 Sample Permanent Guy Easement.doc
| 09/15/2021 |
Download
|
|
TAC 0377 Sample Templates for ROW Acquisition (Land and Easements) 9-15-21.pdf
| 09/15/2021 |
Download
|
|
TAC 0377 Sample Temporary Highway Easement.docx
| 09/15/2021 |
Download
|
|
TAC 0378 RIDOT Road Stream Crossing Design Manual 09-17-2021.pdf
| 09/17/2021 |
Download
|
|
TAC 0379 Exhibit A - Monthly Task Order Status Report.docx
| 09/22/2021 |
Download
|
|
TAC 0379 Exhibit B - WBS for Monthly Task Order Status Reports.xls
| 09/22/2021 |
Download
|
|
TAC 0379 Exhibit C - Sample Invoice Form.xlsx
| 09/22/2021 |
Download
|
|
TAC 0379 Updated Templates for 2021 Task Order Contracts 9-22-21.pdf
| 09/22/2021 |
Download
|
|
TAC 0380 Statewide E-Procurement System Rollout 10-20-21.pdf
| 10/20/2021 |
Download
|
|
TAC 0381 Utility Contact List 10-26-21.pdf
| 10/26/2021 |
Download
|
|
TAC 0382 Attachment Compilation Number 22 Nov 2021 11-17-21.pdf
| 11/17/2021 |
Download
|
|
TAC 0382 Compilation Number 22 Nov 2021 11-17-21.pdf
| 11/17/2021 |
Download
|
|
TAC 0383 - JS 10803 Project Schedule Updates 11-19-21.pdf
| 11/19/2021 |
Download
|
|
TAC 0384 Hot Mix Asphalt HMA Matrix 11-19-21.pdf
| 11/19/2021 |
Download
|
|
TAC 0385 Temporary Barrier for Traffic Control 12-03-21 (Supersedes TAC 0349)
| 12/03/2021 |
Download
|
|
TAC 0386R MASH Permanent Barrier and Test Level Selection 12-14-21.pdf
| 12/14/2021 |
Download
|
|
TAC 0387 ACOE RI Programmatic General Permit Checklist 01-24-2022.pdf
| 01/24/2022 |
Download
|
|
TAC 0387 Attachment ACOE RI Programmatic General Permit Checklist 01-24-2022.pdf
| 01/24/2022 |
Download
|
|
TAC 0388 Attachment OSP Add Change Delete User Form.pdf
| 06/24/2022 |
Download
|
|
TAC 0388 E-Procurement - Training and Email Address 02-04-2022.pdf
| 02/04/2022 |
Download
|
|
TAC 0389 Attachment JS 937 Traffic Failure to Comply 2-17-22.pdf
| 02/17/2022 |
Download
|
|
TAC 0389 JS 937 Traffic Failure to Comply 2-17-22.pdf
| 02/17/2022 |
Download
|
|
TAC 0390 OSP Contract Award CD 2-17-22.pdf
| 02/17/2022 |
Download
|
|
TAC 0391 E-Procurement Required Report 05-09-22.pdf
| 05/09/2022 |
Download
|
|
TAC 0392 Vibration Monitoring during Construction 05-23-22.pdf
| 05/23/2022 |
Download
|
|
TAC 0393 Natina Reactive Color Treatment on Guardrail 06-09-22.pdf
| 06/09/2022 |
Download
|
|
TAC 0394 DEM & CRMC Electronic Signature 06-09-22.pdf
| 06/09/2022 |
Download
|
|
TAC 0395 Attachment JS Specs 06-10-22.pdf
| 06/10/2022 |
Download
|
|
TAC 0395 JS Specs 06-10-22.pdf
| 06/10/2022 |
Download
|
|
TAC 0396 90 Percent Submission Review Meeting 07-06-22.pdf
| 07/06/2022 |
Download
|
|
TAC 0397 ADA Compliance 07-11-22.pdf
| 07/11/2022 |
Download
|
|
TAC 0398 Statewide E-Procurement Training Opportunity 08-10-22.pdf
| 08/10/2022 |
Download
|
|
TAC 0399 E-Procurement New Feature Rollout Date 08-26-22.pdf
| 08/26/2022 |
Download
|
|
TAC 0400 TMP Updated Templates 09-02-22.pdf
| 09/22/2022 |
Download
|
|
TAC 0401 - Attachment DPM 450.01A - Submission Matrix 09-07-22.pdf
| 09/07/2022 |
Download
|
|
TAC 0401 - DPM 450.01A - Submission Matrix 09-07-22.pdf
| 09/07/2022 |
Download
|
|
TAC 0402 Revised Bridge Load Rating Guidelines 09-26-22.pdf
| 09/26/2022 |
Download
|
|
TAC 0403 Categorical Exclusion Programmatic Agreement 10-19-22.pdf
| 10/19/2022 |
Download
|
|
TAC 0403 RIDOT_CE_ChecklistForm_Combined.docx
| 10/19/2022 |
Download
|
|
TAC 0403 Stormwater Worksheets Help Document Aug 2022.pdf
| 10/19/2022 |
Download
|
|
TAC 0403 Stormwater_Worksheets_ABC_08-02-2022.xlsm
| 10/19/2022 |
Download
|
|
TAC 0403 Water Resources_RIDOT NRU Categorical Exclusion Guidance_10_2022.docx
| 10/19/2022 |
Download
|
|
TAC 0404 AASHTO LRFD Specifications for Structural Supports 10-19-22.pdf
| 10/19/2022 |
Download
|
|
TAC 0405 Attachment RIDOT MASH Bridge Details 11.01.2022.pdf
| 11/01/2022 |
Download
|
|
TAC 0405 Interim Guidance for MASH Standard Bridge Details 11.01.2022.pdf
| 11/01/2022 |
Download
|
|
TAC 0406 Bridge Minimum Vertical Clearance Guidelines 11-18-22.pdf
| |
Download
|
|
TAC 0407 Waterproofing Membrane Type 11-02-22.pdf
| 11/02/2022 |
Download
|
|
TAC 0408 Attachment JS Buy America 11-7-22.pdf
| 11/07/2022 |
Download
|
|
TAC 0408 Buy America 11-07-22.pdf
| 11/07/2022 |
Download
|
|
TAC 0409 Attachment JS 929 Field Office 11-16-22.pdf
| 11/16/2022 |
Download
|
|
TAC 0409 JS 929 Field Office 11-16-22.pdf
| 11/16/2022 |
Download
|
|
TAC 0410 Hourly Rate for Consultants 12-6-22.pdf
| 12/06/2022 |
Download
|
|
TAC 0411 Traffic Count Requests 12-19-22.pdf
| 12/19/2022 |
Download
|
|
TAC 0412 Attachment Audit Policy Statement December 28 2022.pdf
| 01/11/2023 |
Download
|
|
TAC 0412 Audit Policy Statement December 28 2022.pdf
| 01/11/2023 |
Download
|
|
TAC 0413 Attachment JS Specs for New Blue Book 02-28-23.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment Newly Added - Recently Retired Standard Items 02-28-23.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment Standard Item List 02-28-23.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_001_COVER_REV1.DWG
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_001_COVER_REV1.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_002_STDSYM_REV2.dwg
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_002_STDSYM_REV2.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_003_STDNOTES01_REV4.dwg
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_003_STDNOTES01_REV4.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_004_STDNOTES02_REV4.dwg
| 02/28/2023 |
Download
|
|
TAC 0413 Attachment XXXXX_V1_004_STDNOTES02_REV4.pdf
| 02/28/2023 |
Download
|
|
TAC 0413 New Blue Book 02-28-23.pdf
| 02/28/2023 |
Download
|
|
TAC 0414 Attachment Newly Added - Recently Retired Standard Items 03-21-23.pdf
| 03/21/2023 |
Download
|
|
TAC 0414 Attachment Standard Item List 03-21-23.pdf
| 03/21/2023 |
Download
|
|
TAC 0414 Standard Item List 03-21-23.pdf
| 03/21/2023 |
Download
|
|
TAC 0415 Attachment Change Order Request Form 041923.pdf
| 04/19/2023 |
Download
|
|
TAC 0415 Construction Change Order Request Form 041923.pdf
| 04/19/2023 |
Download
|
|
TAC 0416 Attachment JS Specs May 2023.pdf
| 05/31/2023 |
Download
|
|
TAC 0416 JS Specs May 2023 05-31-23.pdf
| 05/31/2023 |
Download
|
|
TAC 0417 Attachment Design ROC-CA Form 06-19-23.pdf
| 06/19/2023 |
Download
|
|
TAC 0417 Design ROC-CA Form 06-19-23.pdf
| 06/19/2023 |
Download
|
|
TAC 0418 Attachment JS Specs June 2023.pdf
| 06/20/2023 |
Download
|
|
TAC 0418 JS Specs June 2023 06-20-23.pdf
| 06/20/2023 |
Download
|
|
TAC 0419 Contract Documents Reminder 07-13-23.pdf
| 07/13/2023 |
Download
|
|
TAC 0421 Juneteenth National Freedom Day 07-20-23.pdf
| 07/20/2023 |
Download
|
|
TAC 0422 Attachment Utility Contact list_updated_7-19-23.pdf
| 07/19/2023 |
Download
|
|
TAC 0422 Utility Contact list_updated_7-19-23.pdf
| 07/19/2023 |
Download
|
|
TAC 0423 Mandatory Field Reviews 07-31-23.pdf
| 07/31/2023 |
Download
|
|
TAC 0424 Attachment JS Specs for August Blue Book 08-24-23.pdf
| 08/24/2023 |
Download
|
|
TAC 0424 Attachment Standard Item List 08-24-23.pdf
| 08/24/2023 |
Download
|
|
TAC 0424 Attachment XXXXX_V1_001_COVER_REV2.pdf
| 08/24/2023 |
Download
|
|
TAC 0424 New Blue Book 08-24-23.pdf
| 08/24/2023 |
Download
|
|
TAC 0425 Survey Requirements 09-01-23.pdf
| 09/01/2023 |
Download
|
|
TAC 0426 Steel Conduit 09-07-23.pdf
| 09/07/2023 |
Download
|
|
TAC 0427 Attachment JS Specs Nov 23 11-02-23.pdf
| 11/02/2023 |
Download
|
|
TAC 0427 JS Specs Nov 23 11-02-23.pdf
| 11/02/2023 |
Download
|
|
TAC 0428 Contractor Laydown Storage Areas 11-22-23.pdf
| 11/22/2023 |
Download
|
|
TAC 0429 Traffic Counts 11-09-23.pdf
| 11/09/2023 |
Download
|
|
TAC 0430 Attachment RIDOT_CE_ChecklistForm_Combined-11.2023.docx
| 11/17/2023 |
Download
|
|
TAC 0430 Revised CE Checklist 11-17-23.pdf
| 11/17/2023 |
Download
|
|
TAC 0431 Crash Countermeasures 12-06-23.pdf
| 12/06/2023 |
Download
|
|
TAC 0432 Attachement E-Tool User Registration Form.docx
| 01/18/2024 |
Download
|
|
TAC 0432 Attachement eTool Newsletter.pdf
| 01/18/2024 |
Download
|
|
TAC 0432 Stormwater eTool Rollout Training 01-18-24.pdf
| 01/18/2024 |
Download
|
|
TAC 0433 CAD File Submissions 01-26-24.pdf
| 01/26/2024 |
Download
|
|
TAC 0434 Attachment Boring-Test Pit Log examples.pdf
| 01/30/2024 |
Download
|
|
TAC 0434 Attachment Subsurface Exploration Log Template V1 Jan 2024.xlsx
| 01/30/2024 |
Download
|
|
TAC 0434 Subsurface Exploration Logs 01-30-24.pdf
| 01/30/2024 |
Download
|
|
TAC 0435 Attachment Work Order Deliverables 02-20-24.xlsx
| 02/20/2024 |
Download
|
|
TAC 0435 Work Order Deliverables 02-20-24.pdf
| 02/20/2024 |
Download
|
|
TAC 0436 Law Enforcement Officers and Flagpersons Breakdown 05-01-24.pdf
| 05/01/2024 |
Download
|
|
TAC 0437 Attachment JS Specs for February Blue Book 02-16-24.pdf
| 02/16/2024 |
Download
|
|
TAC 0437 Attachment XXXXX_V1_001_COVER_REV2.dwt
| 02/16/2024 |
Download
|
|
TAC 0437 Attachment XXXXX_V1_001_COVER_REV2.pdf
| 02/16/2024 |
Download
|
|
TAC 0437 New Blue Book 02-16-24.pdf
| 02/16/2024 |
Download
|
|
TAC 0438 Attachment JS Specs May 2024.pdf
| 05/03/2024 |
Download
|
|
TAC 0438 JS Specs May 2024 05-03-24.pdf
| 05/03/2024 |
Download
|
|
TAC 0439 2023 MUTCD 06-07-24.pdf
| 06/07/2024 |
Download
|
|
TAC 0440 Compost Filter Sock and LOD 06-25-24.pdf
| 06/25/2024 |
Download
|
|
TAC 0441 Attachment RIDOT Tricolored Bat Contract Flyer.pdf
| 07/17/2024 |
Download
|
|
TAC 0441 Tricolored Bat Avoidance and Minimization Measures 07-17-24.pdf
| 07/17/2024 |
Download
|
|
TAC 0442 Attachment JS Specs for August Blue Book 08-14-24.pdf
| 08/14/2024 |
Download
|
|
TAC 0442 Attachment Standard Item List 08-14-24.pdf
| 08/14/2024 |
Download
|
|
TAC 0442 Attachment XXXXX_V1_001_COVER_REV 2.pdf
| 08/14/2024 |
Download
|
|
TAC 0442 Attachment XXXXX_V1_001_COVER_REV2.dwt
| 08/14/2024 |
Download
|
|
TAC 0442 New Blue Book 08-14-24.pdf
| 08/14/2024 |
Download
|
|
TAC 0443 Attachment BI-012 Form Bridge Number Request 09-18-24.pdf
| 09/18/2024 |
Download
|
|
TAC 0443 Bridge Number Request 09-18-24.pdf
| 09/18/2024 |
Download
|
|
TAC 0444 Bridge Minimum Vertical Clearance 09-23-24.pdf
| 09/23/2024 |
Download
|
|
TAC 0445 Scour Design Requirements 10-01-24.pdf
| 10/01/2024 |
Download
|
|
TAC 0446 Attachment RhodeWorks JS.pdf
| 10/02/2024 |
Download
|
|
TAC 0446 Attachment RI STD 29.1.2.pdf
| 10/02/2024 |
Download
|
|
TAC 0446 RhodeWorks Signs 10-02-24.pdf
| 10/02/2024 |
Download
|
|
TAC 0447 GRS Walls Substructure Guidelines 10-11-24.pdf
| 10/11/2024 |
Download
|
|
TAPE 098 SUPERSEDED BY TAPE 100 Attachment Sample 2015-06-24 Ws.pdf
| |
Download
|
|
TAPE 106 Paint Coating Testing Under Design Contracts by Master Price Agreement_MPA Steel Inspector0
| 05/20/2016 |
Download
|
|
Technical Infeasibility Determination Policy without concurrence letter Feb. 2010 reduced.pdf
| |
Download
|
|
TEMPLATE 3 PERCENT RETAINAGE.xlsm
| 07/28/2020 |
Download
|
|
TEMPLATE Contractor Invoicing R7-28-20.xlsm
| 07/28/2020 |
Download
|
|
Use of Steel Plates - RIGL 24-8-45.pdf
| 08/24/2021 |
Download
|
|
Utility Pole Setting Responsibility 02-12-2013.pdf
| 02/12/2013 |
Download
|
|
WBS - List of Abbreviations
| 07/26/2004 |
Download
|
|
WBS 1.01 - Project Management Coordination
| 07/26/2004 |
Download
|
|
WBS 1.02 - Preparation of the Base Mapping
| 07/26/2004 |
Download
|
|
WBS 1.03 - Analysis of Existing Conditions
| 07/26/2004 |
Download
|
|
WBS 1.05 - Site Contamination Assessment (Non-Analytical)
| 07/26/2004 |
Download
|
|
WBS 1.05.01A Form - ESA Checklist
| 07/26/2004 |
Download
|
|
WBS 1.06 - Cultural Resources
| 07/26/2004 |
Download
|
|
WBS 1.08 - Conceptual Highway Plans
| 07/26/2004 |
Download
|
|
WBS 1.09 - Bridge Inspections, Evaluations and Reports
| 07/26/2004 |
Download
|
|
WBS 1.10 - Environmental Documentation
| 07/26/2004 |
Download
|
|
WBS 1.11 - Wetland & Quality Pre-Permitting Coordination
| 07/26/2004 |
Download
|
|
WBS 1.11.01A Form - Wetland & Water Quality Checklist
| 07/26/2004 |
Download
|
|
WBS 1.12 - Preliminary Right-of-Way
| 07/26/2004 |
Download
|
|
WBS 1.13 - Subsurface Exploration Program
| 07/26/2004 |
Download
|
|
WBS 1.14 - Storm Water Management & Design
| 07/26/2004 |
Download
|
|
WBS 1.15 - Bridge Type Study Report
| 07/26/2004 |
Download
|
|
WBS 1.16 - Design Study Report
| 07/26/2004 |
Download
|
|
WBS 1.17 - Highway Plans & Profiles of Selected Alternatives
| 07/26/2004 |
Download
|
|
WBS 1.18 - Bridge Plans of the Selected Alternatives
| 07/26/2004 |
Download
|
|
WBS 1.20 - Cost Effectiveness
| 07/26/2004 |
Download
|
|
WBS 2.01 - Project Management & Coordination
| 07/26/2004 |
Download
|
|
WBS 2.02 - Right-of-Way Submission
| 07/26/2004 |
Download
|
|
WBS 2.03 - Traffic & Analysis
| 07/26/2004 |
Download
|
|
WBS 2.04 - Storm Water Management Design
| 07/26/2004 |
Download
|
|
WBS 2.05 - General Plans (Highway)
| 07/26/2004 |
Download
|
|
WBS 2.06 - Bridge Design & Plans
| 07/26/2004 |
Download
|
|
WBS 2.07 - Permitting
| 07/26/2004 |
Download
|
|
WBS 2.09 - Contract Documents
| 07/26/2004 |
Download
|
|
WBS 2.10 - Site Contamination Assessment & Investigation (Analytical)
| 07/26/2004 |
Download
|
|
WBS 2.11 - Utilities
| 07/26/2004 |
Download
|
|
WBS 2.12 - Cost Effectiveness
| 07/26/2004 |
Download
|
|
WBS 3.01 - Project Management & Coordination
| 07/26/2004 |
Download
|
|
WBS 3.02 - Final Highway Plans
| 07/26/2004 |
Download
|
|
WBS 3.03 - Final Bridge Plans
| 07/26/2004 |
Download
|
|
WBS 3.05 - Right-of-Way Submission
| 07/26/2004 |
Download
|
|
WBS 3.06 - Permitting
| 07/26/2004 |
Download
|
|
WBS 3.07 - Utilities
| 07/26/2004 |
Download
|
|
WBS 3.08 - Contract Documents
| 07/26/2004 |
Download
|
|
WBS 3.09 - Cost Effectiveness
| 07/26/2004 |
Download
|
|
WBS 4.01 - Project Management & Coordination
| 07/26/2004 |
Download
|
|
xDPM 450.02 <> RIDOT Format Sheet - DWG (Rev June 2007)
| 06/01/2007 |
Download
|
|
xDPM 450.02 <> RIDOT Format Sheet - PDF (Rev June 2007)
| 06/01/2007 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_001_COVER APR 2014.dwg (Revised and Issued under TAC 0253)
| 04/24/2014 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_002_STDSYM - DWG (Rev June 2007)
| 06/01/2007 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_002_STDSYM - PDF (Rev June 2007)
| 06/01/2007 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_003_STDNOTES01_REV3.dwg (Revised April 2014 -TAC 0253)
| 04/24/2014 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_004_STDNOTES02 - DWG (Rev March 2010)
| 03/10/2010 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_004_STDNOTES02 -PDF (Rev March 2010)
| 03/10/2010 |
Download
|
|
xDPM 450.02 <> XXXXX_V1_005_JSNOTSYM - PDF (Rev June 2007)
| 06/01/2007 |
Download
|
|
xDPM 450.10 <> Sample 06 Highway May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> Sample 07 Highway-Freeway May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> Sample 08 Highway Temporary Easement May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> Sample 09 Permanent Drainage Easement May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> Sample 10 Permanent Aerial Easement May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> Sample 11 Permanent Guy Easement May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> Sample 15 Permanent Easement - Pedestrian Sidewalk May 2015.doc
| 05/01/2015 |
Download
|
|
xDPM 450.10 <> xSample 06 Description of Highway Acquisition
| 04/07/2004 |
Download
|
|
xDPM 450.10 <> xSample 07 Description for Highway and Freeway Acquisition
| 03/29/2004 |
Download
|
|
xDPM 450.10 <> xSample 08 Temporary Highway Easement
| 03/29/2004 |
Download
|
|
xDPM 450.10 <> xSample 09 Temporary Utility Easement
| 03/29/2004 |
Download
|
|
xDPM 450.10 <> xSample 10 Permanent Aerial Easement
| 03/29/2004 |
Download
|
|
xDPM 450.10 <> xSample 11 Permanent Guy Easement
| 03/29/2004 |
Download
|
|
xDPM 450.10 <> xSample 12 Permanent Drainage Easement
| 03/29/2004 |
Download
|
|
xDPM 450.10 <> xSample 13 Permanent Underground Utility Easement
| 04/07/2004 |
Download
|
|
xDPM 450.10 <> xSample 14 Permanent Bikeway Easement
| 01/20/2004 |
Download
|
|
xDPM 450.10 <> xSample 15 Permanent Bikeway Easement Plans
| 01/20/2004 |
Download
|
|
xDPM 480.01 <> gINT Data Template
| 10/31/2007 |
Download
|
|
xDPM 480.01 <> gINT Library File
| 10/31/2007 |
Download
|
|
xSuperseded DPM 450.02 <> XXXXX_V1_001_COVER - DWG (Rev June 2007)
| 06/01/2007 |
Download
|
|
xSuperseded DPM 450.02 <> XXXXX_V1_003_STDNOTES01 - DWG (Rev March 2010)
| 03/10/2010 |
Download
|
|
xSuperseded DPM 450.02 <> XXXXX_V1_003_STDNOTES01 - PDF (Rev March 2010)
| 03/10/2010 |
Download
|
|
xSusperseded DPM 450.02 <> XXXXX_V1_001_COVER - PDF (Rev June 2007)
| 06/01/2007 |