Item Id | Description | UM | WAUP Awarded | WAUP All | Avg. Qty | # of Bidders | # of Contracts |
|
201.0301 | CUTTING AND DISPOSING ISOLATED TREES AND STUMPS (4"- 24") | EACH | $1,795.00 | $1,117.55 | 3.00 | 6 | 1 |
|
201.0321 | CLEARING AND GRUBBING | SY | $15.00 | $8.63 | 4600.00 | 4 | 1 |
|
201.0402 | REMOVE AND DISPOSE CONCRETE CURB | LF | $8.29 | $8.10 | 1303.50 | 10 | 2 |
|
201.0403 | REMOVE AND DISPOSE SIDEWALKS | SY | $29.09 | $16.52 | 363.33 | 14 | 3 |
|
201.0407 | REMOVE AND DISPOSE PAVEMENT AND RIGID BASE | SY | $14.06 | $19.73 | 2008.50 | 8 | 2 |
|
201.0409 | REMOVE AND DISPOSE FLEXIBLE PAVEMENT | SY | $5.88 | $9.57 | 3679.67 | 14 | 3 |
|
201.0410 | REMOVE AND DISPOSE CATCH BASINS | EACH | $591.67 | $562.90 | 2.00 | 14 | 3 |
|
201.0414 | REMOVE AND DISPOSE PIPE - ALL SIZES | LF | $15.95 | $19.94 | 43.33 | 14 | 3 |
|
201.0415 | REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES | LF | $5.00 | $5.03 | 991.00 | 14 | 3 |
|
201.0419 | REMOVE AND DISPOSE FENCE | LF | $5.00 | $5.00 | 775.00 | 4 | 1 |
|
201.0421 | REMOVE AND DISPOSE BITUMINOUS CURB | LF | $2.43 | $2.53 | 671.50 | 10 | 2 |
|
201.0423 | REMOVE AND DISPOSE HANDHOLE | EACH | $150.00 | $185.52 | 4.00 | 6 | 1 |
|
201.0428 | REMOVE AND DISPOSE FRAME AND GRATE OR FRAME AND COVER | EACH | $223.17 | $142.17 | 20.00 | 14 | 3 |
|
201.0430 | REMOVE AND DISPOSE CONCRETE MEDIAN BARRIER | LF | $31.92 | $32.22 | 290.00 | 8 | 2 |
|
201.0610 | REMOVE AND DISPOSE DIRECTIONAL, WARNING, REGULATORY, SERVICE, AND STREET SIGNS | EACH | $30.00 | $186.35 | 18.00 | 10 | 2 |
|
201.0622 | REMOVE AND DISPOSE OVERHEAD SIGN PANEL | EACH | $300.00 | $300.00 | 1.00 | 4 | 1 |
|
201.0623 | REMOVE AND DISPOSE OVERHEAD SIGN STRUCTURE | EACH | $6,800.00 | $8,500.00 | 2.00 | 4 | 1 |
|
202.0100 | EARTH EXCAVATION | CY | $6.14 | $14.55 | 2163.50 | 10 | 2 |
|
202.0201 | ROCK EXCAVATION MECHANICAL | CY | $78.13 | $27.78 | 120.00 | 10 | 2 |
|
202.0700 | COMMON BORROW | CY | $4.55 | $15.72 | 1627.50 | 10 | 2 |
|
202.0800 | GRAVEL BORROW | CY | $20.00 | $32.50 | 2700.00 | 4 | 1 |
|
203.0100 | STRUCTURAL EXCAVATION EARTH | CY | $40.00 | $37.50 | 5700.00 | 4 | 1 |
|
203.0310 | STRUCUTRAL EXCAVATION MASONRY | CY | $145.00 | $93.75 | 416.00 | 4 | 1 |
|
203.0530 | DEWATERING | LS | $100.00 | $5,025.50 | 1.00 | 4 | 1 |
|
203.0700 | PERVIOUS FILL | CY | $30.00 | $45.00 | 1540.00 | 4 | 1 |
|
204.0100 | TRIMMING AND FINE GRADING | SY | $8.39 | $4.55 | 9835.33 | 14 | 3 |
|
206.0301 | COMPOST FILTER SOCK | LF | $5.27 | $5.22 | 1504.00 | 14 | 3 |
|
207.0210 | STONE CHECK DAMS | CF | $15.00 | $267.50 | 70.00 | 4 | 1 |
|
207.0310 | COMPOST FILTER SOCK CHECK DAMS | LF | $8.00 | $8.00 | 850.00 | 4 | 1 |
|
209.0200 | SACK INSERT CATCH BASIN INLET PROTECTION | EACH | $195.00 | $186.25 | 46.00 | 4 | 1 |
|
209.0210 | HIGH FLOW SACK INSERT CATCH BASIN INLET PROTECTION | EACH | $125.00 | $156.25 | 26.00 | 4 | 1 |
|
211.0100 | CONSTRUCTION ACCESSES STANDARD 9.9.0 | SY | $19.48 | $24.30 | 361.00 | 8 | 2 |
|
212.2100 | MAINTENANCE AND CLEANING OF EROSION AND POLLUTION CONTROLS | LS | $17,000.00 | $15,400.00 | 1.00 | 10 | 2 |
|
213.0100 | PLACEMENT OF MILLINGS BENEATH GUARDRAIL | LF | $10.00 | $7.00 | 990.00 | 4 | 1 |
|
302.0100 | GRAVEL BORROW SUBBASE COURSE | CY | $15.93 | $33.44 | 1396.67 | 14 | 3 |
|
303.0100 | SPECIAL GRADED AGGREGATE FOR SHAPING AND TRIMMING DRIVEWAYS OR SHOULDERS | CY | $100.00 | $106.25 | 40.00 | 4 | 1 |
|
401.1000 | CLASS 19.0 HMA | TON | $104.34 | $94.88 | 2085.67 | 14 | 3 |
|
401.2005 | CLASS 12.5 HMA FOR MISCELLANEOUS WORK | TON | $1.00 | $66.73 | 600.00 | 4 | 1 |
|
401.2100 | MODIFIED CLASS 12.5 HMA | TON | $107.69 | $108.43 | 1160.50 | 10 | 2 |
|
401.3000 | CLASS 9.5 HMA | TON | $205.00 | $185.00 | 45.00 | 4 | 1 |
|
401.3002 | CLASS 9.5 HMA FOR LEVELLING | TON | $205.00 | $156.25 | 50.00 | 4 | 1 |
|
401.3101 | MODIFIED CLASS 9.5 HMA FOR BRIDGE DECKS | TON | $205.00 | $176.25 | 1050.00 | 4 | 1 |
|
401.4000 | CLASS 4.75 HMA | TON | $230.00 | $295.00 | 3.00 | 4 | 1 |
|
403.0300 | ASPHALT EMULSION TACK COAT | SY | $0.41 | $0.46 | 31931.67 | 14 | 3 |
|
410.1000 | TEMPORARY PATCHING MATERIAL/TRENCHES | TON | $288.60 | $173.15 | 312.50 | 8 | 2 |
|
601.0200 | CLASS XX PORTLAND CEMENT CONCRETE | CY | $292.50 | $303.13 | 6.00 | 8 | 2 |
|
601.0300 | CLASS A PORTLAND CEMENT CONCRETE | CY | $275.00 | $231.25 | 27.00 | 4 | 1 |
|
603.1000 | CONTROLLED LOW STRENGTH MATERIAL | CY | $189.29 | $174.73 | 28.00 | 10 | 2 |
|
701.0412 | REINFORCED CONCRETE PIPE M 170 CLASS III 12 INCH | LF | $70.16 | $89.77 | 176.33 | 14 | 3 |
|
701.0415 | REINFORCED CONCRETE PIPE M 170 CLASS III 15 INCH | LF | $65.00 | $78.75 | 120.00 | 4 | 1 |
|
701.6012 | 12 INCH DUCTILE IRON SEWER SAFE PIPE CLASS 52 | LF | $200.00 | $191.25 | 49.00 | 4 | 1 |
|
701.7712 | 12 INCH REINFORCED CONCRETE PIPE END SECTION STANDARD 2.3.0 | EACH | $1,052.50 | $992.81 | 1.33 | 14 | 3 |
|
701.7715 | 15 INCH REINFORCED CONCRETE PIPE END SECTION STANDARD 2.3.0 | EACH | $1,110.00 | $1,165.00 | 1.00 | 4 | 1 |
|
702.0512 | FRAME AND GRATE STANDARD 6.3.0 | EACH | $750.00 | $967.48 | 3.00 | 6 | 1 |
|
702.0513 | FRAME AND GRATE STANDARD 6.3.1 | EACH | $1,973.10 | $1,186.58 | 21.00 | 8 | 2 |
|
702.0515 | FRAME AND GRATE HIGH CAPACITY STANDARD 6.3.3 | EACH | $1,100.00 | $1,050.00 | 7.00 | 4 | 1 |
|
702.0517 | FRAME AND GRATE, STANDARD 6.3.2 | EACH | $1,300.00 | $1,041.25 | 2.00 | 4 | 1 |
|
702.0521 | FRAME AND COVER STANDARD 6.2.0 | EACH | $835.00 | $887.49 | 1.00 | 10 | 2 |
|
702.0522 | FRAME AND COVER STANDARD 6.2.1 | EACH | $1,300.00 | $1,236.25 | 5.00 | 4 | 1 |
|
702.0533 | PRECAST CONCRETE APRON STONE 38'' STANDARD 7.1.8 | EACH | $250.00 | $194.00 | 6.00 | 4 | 1 |
|
702.0540 | GRANITE INLET STONE 5 FOOT STANDARD 7.3.5 | EACH | $650.00 | $510.00 | 2.00 | 4 | 1 |
|
702.0605 | PRECAST CATCH BASIN 4' DIAMETER STANDARD 4.4.0 | EACH | $2,940.00 | $3,533.50 | 3.33 | 14 | 3 |
|
702.0630 | PRECAST MANHOLE 4' DIAMETER STANDARD 4.2.0 | EACH | $3,560.00 | $3,816.81 | 2.50 | 10 | 2 |
|
702.0722 | SOLID BLOCK SHALLOW TYPE "F" SQUARE CATCH BASIN STANDARD 3.5.0 | EACH | $3,500.00 | $5,000.00 | 1.00 | 4 | 1 |
|
704.0100 | RECONSTRUCT CATCH BASIN/CORBEL CONES | EACH | $1,300.00 | $975.25 | 5.00 | 4 | 1 |
|
704.0300 | RECONSTRUCT CATCH BASIN/VERTICAL WALLS | VLF | $128.07 | $200.93 | 53.00 | 8 | 2 |
|
706.9000 | PLUG AND CAP PIPE ALL SIZES | EACH | $470.00 | $230.25 | 2.00 | 4 | 1 |
|
707.1200 | ADJUST CATCH BASIN TO MANHOLE | EACH | $2,850.00 | $1,637.50 | 1.00 | 8 | 2 |
|
707.1900 | ADJUST FRAME & COVER TO GRADE | EACH | $450.00 | $319.00 | 22.00 | 4 | 1 |
|
707.2000 | ADJUST FRAME AND GRATE TO GRADE | EACH | $449.47 | $336.07 | 31.33 | 14 | 3 |
|
708.9040 | CLEANING AND FLUSHING PIPE ALL SIZES | LF | $4.82 | $2.94 | 2290.00 | 14 | 3 |
|
708.9041 | CLEANING CATCH BASINS ALL TYPES AND SIZES | EACH | $239.20 | $137.87 | 23.00 | 14 | 3 |
|
708.9042 | CLEANING MANHOLES ALL TYPES AND SIZES | EACH | $350.00 | $155.63 | 23.00 | 4 | 1 |
|
804.1710 | PILE LOAD TEST 100 TON | EACH | $25,000.00 | $13,475.00 | 4.00 | 4 | 1 |
|
808.0601 | CONCRETE SUBSTRUCTURE CLASS HP 3/4'' PIERS, COL, CAP | CY | $3,500.00 | $6,050.00 | 21.00 | 4 | 1 |
|
808.1501 | CONCRETE SUPERSTRUCTURE CLASS HP 3/4'' BRIDGE DECKS | CY | $1,250.00 | $2,250.00 | 106.00 | 4 | 1 |
|
808.1503 | CONCRETE SUPERSTRUCTURE CLASS HP 3/4'' PARAPETS | CY | $2,500.00 | $5,062.50 | 18.00 | 4 | 1 |
|
808.1642 | PREFORMED POLYETHYLENE FOAM JOINT FILLER 1'' | SF | $2.00 | $6.75 | 540.00 | 4 | 1 |
|
808.1646 | PREFORMED POLYETHYLENE FOAM JOINT FILLER 2'' | SF | $2.00 | $9.25 | 450.00 | 4 | 1 |
|
810.0210 | GALVANIZED BAR REINFORCEMENT GRADE 60 | LBS | $3.00 | $2.75 | 36100.00 | 4 | 1 |
|
810.0702 | WELDED WIRE FABRIC (GALVANIZED) | SF | $7.00 | $5.00 | 2610.00 | 4 | 1 |
|
813.0310 | COLD SPRAY-APPLIED LIQUID MEMBRANE | SY | $60.00 | $64.75 | 1320.00 | 4 | 1 |
|
817.2111 | REPAIRS TO STRUCTURE CONCRETE MASONRY - PATCHING MORTAR | SF | $58.00 | $77.00 | 3375.00 | 4 | 1 |
|
817.2142 | REPAIRS TO STRUCTURE CONCRETE MASONRY - FORM AND CAST IN PLACE CONCRETE | CF | $220.00 | $290.00 | 5155.00 | 4 | 1 |
|
819.0800 | DRILL AND GROUT REINFORCING DOWELS | EACH | $105.00 | $83.75 | 718.00 | 4 | 1 |
|
820.0100 | CONCRETE SURFACE TREATMENT PROTECTIVE SEALER | SF | $3.00 | $4.33 | 10680.00 | 4 | 1 |
|
824.0100 | STRUCTURAL STEEL ERECT | LBS | $10.54 | $17.28 | 3955.50 | 6 | 2 |
|
830.0111 | ALUMINUM BRIDGE RAIL 1 BAR STRUCTURAL | LF | $278.00 | $278.50 | 50.00 | 4 | 1 |
|
830.0200 | ALUMINUM BRIDGE RAIL REMOVE AND RESET | LF | $155.00 | $128.75 | 180.00 | 4 | 1 |
|
832.8050 | BRIDGE MINIMUM CLEARANCE SIGNS | EACH | $835.00 | $876.25 | 2.00 | 4 | 1 |
|
834.0111 | VERTICAL FACE GRANITE CURB STRAIGHT 10'' REVEAL | LF | $60.00 | $100.00 | 168.00 | 4 | 1 |
|
836.0100 | STRUCTURAL CONCRETE CRACK REPAIR BY EPOXY-RESIN BASE ADHESIVE INJECTION | LF | $86.37 | $92.62 | 322.00 | 6 | 2 |
|
839.0200 | FULL DEPTH REMOVAL AND DISPOSAL OF BITUMINOUS PAVEMENT FROM CONCRETE BRIDGE DECKS | SY | $18.00 | $25.75 | 1242.00 | 4 | 1 |
|
901.0101 | GUARDRAIL STEEL BEAM SINGLE FACE EARTH AND ASPHALT | LF | $31.00 | $32.11 | 577.00 | 6 | 1 |
|
901.0151 | TERMINAL END SECTION SINGLE FACE STANDARD 34.3.2 | EACH | $210.00 | $215.25 | 2.00 | 4 | 1 |
|
901.0163 | GUARDRAIL STEEL BEAM POST IN LEDGE STANDARD 34.1.2 | EACH | $725.00 | $743.13 | 10.00 | 4 | 1 |
|
901.0165 | STEEL BEAM GUARDRAIL SECTION (12.5 FT. BY 12.0 INCHES) | EACH | $356.00 | $354.50 | 92.00 | 4 | 1 |
|
903.0206 | CHAIN LINK FENCE 6' STD 31.2.0 | LF | $79.00 | $79.00 | 308.00 | 4 | 1 |
|
903.0231 | DOUBLE GATE, CHAIN LINK 6' STANDARD 31.2.0 | EACH | $2,150.00 | $2,150.00 | 3.00 | 4 | 1 |
|
903.0410 | TEMPORARY CHAIN LINK FENCE | LF | $15.00 | $15.00 | 300.00 | 4 | 1 |
|
904.0100 | REMOVE AND RESET FENCE AND/OR RAILING | LF | $85.00 | $85.00 | 30.00 | 4 | 1 |
|
904.0101 | REMOVE AND RESET FENCE AND/OR RAILING CHAIN LINK | LF | $140.00 | $150.00 | 20.00 | 6 | 1 |
|
905.0110 | PORTLAND CEMENT SIDEWALK MONOLITHIC STANDARD 43.1.0 | CY | $484.50 | $455.80 | 43.00 | 14 | 3 |
|
905.0131 | PORTLAND CEMENT CONCRETE MEDIAN 6'' MONOLITHIC | CY | $400.00 | $637.50 | 6.00 | 4 | 1 |
|
906.0103 | GRANITE TRANSITION CURB VERTICAL FACE TO SLOPED FACE STANDARD 7.4.2 | EACH | $425.00 | $568.75 | 1.00 | 4 | 1 |
|
906.0110 | GRANITE CURB, QUARRY SPLIT STRAIGHT, STANDARD 7.3.0 | LF | $60.00 | $63.25 | 162.00 | 4 | 1 |
|
906.0118 | 6' GRANITE TRANSITION CURB, QUARRY SPLIT SPECIAL TRANSITION STANDARD 7.3.2 | EACH | $420.00 | $456.71 | 5.00 | 10 | 2 |
|
906.0120 | GRANITE WHEELCHAIR RAMP CURB STANDARDS 7.3.3, 43.3.0 AND 43.3.1 | EACH | $900.00 | $1,049.37 | 2.00 | 6 | 1 |
|
906.0131 | GRANITE RAMP STONE CIRCULAR STANDARD 7.3.9 | EACH | $350.00 | $399.64 | 2.00 | 6 | 1 |
|
906.0210 | CEMENT CONCRETE CURB PRECAST STRAIGHT STANDARD 7.1.0 | LF | $40.00 | $36.25 | 40.00 | 4 | 1 |
|
906.0211 | CEMENT CONCRETE CURB PRECAST CIRCULAR STANDARD 7.1.0 | LF | $37.00 | $38.50 | 72.00 | 4 | 1 |
|
906.0221 | 6' PRECAST CONCRETE TRANSITION CURB STANDARD 7.1.2 | EACH | $280.00 | $217.50 | 2.00 | 4 | 1 |
|
906.0230 | CEMENT CONCRETE SLOPE FACE CURB PRECAST STRAIGHT STANDARD 7.2.0 | LF | $30.62 | $33.06 | 1505.50 | 10 | 2 |
|
906.0231 | CEMENT CONCRETE SLOPE FACE CURB PRECAST CIRCULAR STANDARD 7.2.0 | LF | $38.77 | $37.66 | 48.00 | 10 | 2 |
|
906.0250 | PRECAST CONCRETE WHEELCHAIR RAMP CURB STANDARDS 7.1.3, 43.3.0 AND 43.3.1 | EACH | $860.00 | $515.00 | 2.00 | 4 | 1 |
|
906.0263 | PRECAST CONCRETE RAMP STONE 18-INCH CIRCULAR STANDARD 7.1.9 | EACH | $180.00 | $220.00 | 1.00 | 4 | 1 |
|
906.0270 | PRECAST CONCRETE TRANSITION CURB STANDARD 7.2.2 | EACH | $280.00 | $276.25 | 10.00 | 4 | 1 |
|
906.0271 | PRECAST CONCRETE SLOPE FACE TRANSITION CURB STANDARD 7.2.1 | EACH | $280.00 | $282.50 | 3.00 | 4 | 1 |
|
906.0280 | 3' PRECAST CONCRETE TRANSITION CURB STANDARD 7.1.1 | EACH | $220.00 | $236.25 | 1.00 | 4 | 1 |
|
906.0602 | BITUMINOUS BERM STANDARD 7.5.1 | LF | $1.00 | $2.08 | 878.00 | 6 | 1 |
|
907.0100 | WATER FOR DUST CONTROL | MGAL | $14.50 | $14.50 | 53.33 | 14 | 3 |
|
909.3021 | PRECAST MEDIAN BARRIER SINGLE-FACED STANDARD 40.2.1 | LF | $95.00 | $115.00 | 225.00 | 4 | 1 |
|
914.5010 | FLAGPERSONS | MHRS | $54.92 | $63.53 | 830.00 | 16 | 4 |
|
914.5020 | FLAGPERSONS - OVERTIME | MHRS | $66.87 | $78.19 | 318.00 | 16 | 4 |
|
915.0500 | PRECISE LEVEL MONUMENT REINFORCED CONCRETE W/ STANDARD BENCH MARK HEAD STANDARDS 14.4.0 & 14.4.1 | EACH | $575.00 | $575.00 | 1.00 | 4 | 1 |
|
915.0520 | GEODETIC SURVEY DISK STANDARD 14.4.3 | EACH | $525.00 | $406.25 | 1.00 | 4 | 1 |
|
916.0650 | REMOVE, RELOCATE AND RESET SHOCK ABSORBING BARRIER MODULES | GRP | $1,750.00 | $1,462.50 | 18.00 | 4 | 1 |
|
919.0101 | TEST PITS | EACH | $544.44 | $450.21 | 9.00 | 10 | 2 |
|
920.0070 | DUMPED STONE RIPRAP R-3, R-4, 4-5 STANDARD 8.3.0 | CY | $90.00 | $128.75 | 6.00 | 4 | 1 |
|
920.0085 | PLACED STONE RIPRAP R-3, R-4, R-5 STANDARD 8.3.0 | CY | $155.00 | $151.25 | 20.00 | 4 | 1 |
|
920.0130 | BEDDING FOR RIPRAP FS-1 STANDARD 8.3.0 | SY | $50.00 | $38.00 | 60.00 | 4 | 1 |
|
920.0150 | BEDDING FOR RIPRAP FS-2 STANDARD 8.3.0 | CY | $220.00 | $211.25 | 2.00 | 4 | 1 |
|
920.0200 | FILTER FABRIC FOR RIP-RAP | SY | $1.00 | $2.45 | 18.00 | 4 | 1 |
|
921.0100 | SLOPE PAVING 16X8X4'' | SY | $80.00 | $126.25 | 1535.00 | 4 | 1 |
|
922.0100 | TEMPORARY CONSTRUCTION SIGNS STANDARD 29.1.0 AND 27.1.1 | SF | $28.70 | $23.12 | 1257.25 | 16 | 4 |
|
923.0105 | DRUM BARRICADE STANDARD 26.2.0 | BDAY | $0.23 | $0.24 | 12825.00 | 16 | 4 |
|
923.0120 | PLASTIC PIPE BARRICADE STANDARD 26.3.0 | EACH | $1.00 | $66.00 | 15.00 | 10 | 2 |
|
923.0125 | PLASTIC PIPE TYPE III BARRICADE STANDARD 26.3.1 | EACH | $95.00 | $106.25 | 18.00 | 4 | 1 |
|
923.0200 | FLUORESCENT TRAFFIC CONES STANDARD 26.1.0 | EACH | $17.39 | $14.43 | 270.00 | 16 | 4 |
|
924.0113 | ADVANCE WARNING ARROW PANEL | PDAY | $8.24 | $9.93 | 315.00 | 16 | 4 |
|
925.0112 | PORTABLE CHANGEABLE MESSAGE SIGN | PDAY | $18.75 | $19.65 | 553.00 | 16 | 4 |
|
928.0500 | SHADOW OR ADVANCE WARNING VEHICLE WITH IMPACT ATTENUATOR AND FLASHING ARROW BOARD | HRS | $78.94 | $106.14 | 271.25 | 16 | 4 |
|
929.0110 | FIELD OFFICE | PMO | $2,681.82 | $2,710.26 | 22.00 | 14 | 3 |
|
931.0110 | CLEANING AND SWEEPING PAVEMENT | HSY | $6.98 | $10.40 | 455.00 | 10 | 2 |
|
932.0100 | CUTTING AND MATCHING ASPHALT | LF | $6.47 | $4.31 | 627.33 | 14 | 3 |
|
932.0200 | FULL-DEPTH SAWCUT OF BITUMINOUS PAVEMENT | LF | $4.64 | $2.93 | 865.33 | 14 | 3 |
|
932.0210 | FULL DEPTH SAWCUT OF BITUMINOUS PAVEMENT AND RIGID BASE | LF | $10.08 | $5.60 | 360.00 | 8 | 2 |
|
932.0220 | FULL DEPTH SAWCUT OF BITUMINOUS SIDEWALK/DRIVEWAY | LF | $15.38 | $5.07 | 89.00 | 8 | 2 |
|
932.0230 | FULL DEPTH SAWCUT OF PORTLAND CEMENT CONCRETE SIDEWALK/DRIVEWAY | LF | $8.17 | $4.28 | 63.00 | 14 | 3 |
|
935.0400 | REMOVING BITUMINOUS PAVEMENT BY MICRO MILLING | SY | $3.54 | $3.56 | 15600.00 | 14 | 3 |
|
936.0100 | MOBILIZATION AND DEMOBILIZATION | LS | $348,500.00 | $507,654.93 | 1.00 | 16 | 4 |
|
937.0200 | MAINTENANCE AND MOVEMENT TRAFFIC PROTECTION | LS | $268,750.00 | $279,266.67 | 1.00 | 16 | 4 |
|
942.0200 | DETECTABLE WARNING PANEL STANDARD 48.1.0 | SF | $38.26 | $50.24 | 60.50 | 10 | 2 |
|
943.0200 | TRAINEE MAN-HOURS | MHRS | $6.00 | $6.00 | 1300.00 | 4 | 1 |
|
L01.0102 | LOAM BORROW 4 INCHES DEEP | SY | $4.80 | $5.15 | 3941.67 | 14 | 3 |
|
L01.0104 | PLANTABLE SOIL 4 INCHES DEEP | SY | $6.00 | $6.00 | 780.00 | 4 | 1 |
|
L02.0101 | GENERAL HIGHWAY SEEDING (TYPE 1) | SY | $1.90 | $1.93 | 5366.00 | 8 | 2 |
|
L02.0102 | RESIDENTIAL SEEDING (TYPE 2) | SY | $2.25 | $1.79 | 1093.00 | 6 | 1 |
|
L05.0505 | EROSION CONTROL BLANKET | SY | $5.00 | $5.00 | 830.00 | 4 | 1 |
|
L05.0506 | JUTE MESH | SY | $4.50 | $4.63 | 625.00 | 4 | 1 |
|
L11.0102 | TREE PLANT PROTECTION DEVICE STANDARD 51.1.0 | EACH | $220.00 | $200.00 | 11.00 | 6 | 1 |
|
T04.5001 | 6 AWG SINGLE CONDUCTOR CABLE 600V INSULATION | LF | $1.00 | $5.05 | 65.00 | 4 | 1 |
|
T04.5302 | 14 AWG 2 CONDUCTOR TWISTED SHIELDED CABLE | LF | $1.00 | $5.08 | 85.00 | 4 | 1 |
|
T05.0100 | PRECAST TYPE A HANDHOLE STANDARD 18.2.0 | EACH | $1,200.00 | $1,200.00 | 1.00 | 4 | 1 |
|
T05.1030 | ADJUST HANDHOLE TO GRADE | EACH | $1,750.00 | $675.00 | 30.00 | 4 | 1 |
|
T06.5430 | 3 INCH SCHEDULE 80 POLYVINYL CHLORIDE PLASTIC CONDUIT - UNDER EXISTING PAVEMENT | LF | $70.00 | $65.00 | 50.00 | 4 | 1 |
|
T13.1000 | TRAFFIC DETECTORS-LOOP, STANDARD 19.6.0 | LF | $10.00 | $10.00 | 640.00 | 4 | 1 |
|
T15.0100 | DIRECTIONAL REGULATORY AND WARNING SIGNS | SF | $39.30 | $39.12 | 323.28 | 10 | 2 |
|
T15.0200 | REMOVE AND RELOCATE DIRECTIONAL REGULATORY AND WARNING SIGN | EACH | $187.50 | $192.71 | 6.00 | 8 | 2 |
|
T15.1100 | STREET SIGN - OVERHEAD MOUNTED | EACH | $575.00 | $579.17 | 2.00 | 6 | 1 |
|
T17.0100 | OVERHEAD SIGN PANELS | SF | $24.00 | $24.63 | 181.00 | 4 | 1 |
|
T17.0204 | OVERHEAD SIGN STRUCTURE 31-35 FOOT CANTILEVER - STEEL | EACH | $58,400.00 | $63,400.00 | 1.00 | 4 | 1 |
|
T20.0706 | 6 INCH WHITE WATERBORNE PAINT PAVEMENT MARKINGS | LF | $0.22 | $0.22 | 27599.67 | 14 | 3 |
|
T20.0712 | 12 INCH WHITE WATERBORNE PAINT PAVEMENT MARKINGS | LF | $0.90 | $1.32 | 2094.50 | 10 | 2 |
|
T20.0900 | BI-DIRECTIONAL CONTROL DEVICE STANDARD 20.2.0 | EACH | $577.00 | $661.23 | 5.00 | 10 | 2 |
|
T20.0906 | 6 INCH YELLOW WATERBORNE PAINT PAVEMENT MARKINGS | LF | $0.22 | $0.22 | 15108.33 | 14 | 3 |
|
T20.1401 | WATERBORNE PAINT PAVEMENT MARKING SYMBOL - ARROW (STRAIGHT, LEFT, RIGHT OR COMBINED) STANDARD 20.1.0 | EACH | $38.53 | $39.17 | 17.00 | 10 | 2 |
|
T20.1405 | WATERBORNE PAINT PAVEMENT MARKING SYMBOL - YIELD LINE TRIANGLE (ALL SIZES) | EACH | $78.33 | $72.57 | 4.50 | 10 | 2 |
|
T20.1410 | WATERBORNE PAINT PAVEMENT MARKING WORD ("ONLY", "STOP", "YIELD", "AHEAD", "XING", "SCHOOL", OR OTHER) STANDARD 20.1.0 | EACH | $75.87 | $90.59 | 23.00 | 10 | 2 |
|
T20.2406 | 6 INCH WHITE FINAL EPOXY RESIN PAVEMENT MARKINGS | LF | $0.44 | $0.45 | 6776.08 | 14 | 3 |
|
T20.2412 | 12 INCH WHITE FINAL EPOXY RESIN PAVEMENT MARKINGS | LF | $2.79 | $2.93 | 1593.00 | 14 | 3 |
|
T20.2804 | 4 INCH YELLOW FINAL EPOXY RESIN PAVEMENT MARKINGS | LF | $0.40 | $0.44 | 1032.00 | 4 | 1 |
|
T20.2806 | 6 INCH YELLOW FINAL EPOXY RESIN PAVEMENT MARKINGS | LF | $0.44 | $0.44 | 5257.00 | 8 | 2 |
|
T20.2806 | 6 INCH YELLOW FINAL EPOXY RESIN PAVEMENT MARKINGS | LF | $0.44 | $0.46 | 1658.00 | 6 | 1 |
|
T20.2812 | 12 INCH YELLOW FINAL EPOXY RESIN PAVEMENT MARKINGS | LF | $3.00 | $3.89 | 25.00 | 4 | 1 |
|
T20.3401 | FINAL EPOXY RESIN PAVEMENT MARKING SYMBOL - ARROW (STRAIGHT, LEFT, RIGHT OR COMBINED) STANDARD 20.1.0 | EACH | $85.00 | $88.03 | 11.00 | 10 | 2 |
|
T20.3405 | FINAL EPOXY RESIN PAVEMENT MARKING SYMBOL - YIELD LINE TRIANGLE (ALL SIZES) | EACH | $152.50 | $149.75 | 3.00 | 10 | 2 |
|
T20.3407 | FINAL EPOXY RESIN PAVEMENT MARKING SYMBOL - PEDESTRIAN | EACH | $125.00 | $125.00 | 2.00 | 4 | 1 |
|
T20.3410 | FINAL EPOXY RESIN PAVEMENT MARKING WORD ("ONLY", "STOP", "YIELD", "AHEAD", "XING", "SCHOOL", OR OTHER) STANDARD 20.1.0 | EACH | $108.46 | $159.26 | 6.50 | 10 | 2 |
|
T20.4506 | REMOVE PAVEMENT MARKING LINE - LESS THAN OR EQUAL TO 6 INCHES WIDE | LF | $0.46 | $0.47 | 32710.00 | 8 | 2 |
|
T20.4508 | REMOVE PAVEMENT MARKING LINE - GREATER THAN 6 INCHES WIDE | LF | $1.25 | $1.36 | 1400.00 | 4 | 1 |
|
T20.4511 | REMOVE PAVEMENT MARKING SYMBOL - ARROW (STRAIGHT, LEFT, RIGHT OR COMBINED) | EACH | $50.00 | $52.00 | 6.00 | 4 | 1 |
|
T20.4515 | REMOVE PAVEMENT MARKING SYMBOL - YIELD LINE TRIANGLE (ALL SIZES) | EACH | $100.00 | $64.50 | 2.00 | 4 | 1 |
|
T20.4520 | REMOVE PAVEMENT MARKING WORD ("ONLY", "STOP", "YIELD", "AHEAD", "XING", "SCHOOL", OR OTHER) | EACH | $75.00 | $79.19 | 10.00 | 4 | 1 |
|